Dewatering Bin

Assembly

Settling bin that drains and decants the slurry so dewatered ash can be discharged to trucks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Dewatering Bin parts and their functions

7 top-level parts · 27 parts in total · full bill of materials below
Dewatering Bin parts diagram: 1 bin shell, 2 telescopic decant pipe, 3 underflow cone, 4 bin discharge gate, 5 bin vent filter, 6 bin wall vibrator, 7 makeup water valve. 27 parts in 7 top-level items.
Dewatering Bin parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bin Shell 4 parts 1× Bolted carbon-steel settling bin, conical bottom.
2 Telescopic Decant Pipe 4× Telescopic decant
3 Underflow Cone 1× Discharge cone concentrating settled ash.
4 Bin Discharge Gate 2 parts 2× Slide gate metering ash into trucks below.
5 Bin Vent Filter 1× Cartridge vent filter on the bin top.
6 Bin Wall Vibrator 2× Bin wall vibrators
7 Makeup Water Valve 1× Motorized globe valve topping up the water seal.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Dewatering Bin

7 top-level lines · 13 rows shown · 27 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bin Shell 4 parts ash-handling-system-bin-shell 1× 1 14 assembly
1.1 Bin Plate ash-handling-system-bin-plate 1× 1 · part
1.2 Hopper Stiffener Rib ash-handling-system-hopper-stiffener 6× 6 · part
1.3 Bin Wear Liner ash-handling-system-bin-liner 6× 6 · part
1.4 Fastener Set fastener-set 1× 1 · part
2 Telescopic Decant Pipe ash-handling-system-decant-pipe 4× 4 · part
3 Underflow Cone ash-handling-system-underflow-cone 1× 1 · part
4 Bin Discharge Gate 2 parts ash-handling-system-discharge-gate 2× 2 2 assembly
4.1 Knife Gate Blade ash-handling-system-gate-blade 1× 2 · part
4.2 Hydraulic Cylinder ash-handling-system-hydraulic-cylinder 1× 2 · part
5 Bin Vent Filter ash-handling-system-bin-vent 1× 1 · part
6 Bin Wall Vibrator ash-handling-system-vibrator 2× 2 · part
7 Makeup Water Valve ash-handling-system-makeup-water-valve 1× 1 · part

Where the dewatering bin is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks