Dewatering Bin
AssemblySettling bin that drains and decants the slurry so dewatered ash can be discharged to trucks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Dewatering Bin parts and their functions
7 top-level parts · 27 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bin Shell 4 parts | 1× | Bolted carbon-steel settling bin, conical bottom. |
| 2 | Telescopic Decant Pipe | 4× | Telescopic decant |
| 3 | Underflow Cone | 1× | Discharge cone concentrating settled ash. |
| 4 | Bin Discharge Gate 2 parts | 2× | Slide gate metering ash into trucks below. |
| 5 | Bin Vent Filter | 1× | Cartridge vent filter on the bin top. |
| 6 | Bin Wall Vibrator | 2× | Bin wall vibrators |
| 7 | Makeup Water Valve | 1× | Motorized globe valve topping up the water seal. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Dewatering Bin
7 top-level lines · 13 rows shown · 27 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bin Shell 4 parts | ash-handling-system-bin-shell | 1× | 1 | 14 | assembly |
| 1.1 | Bin Plate | ash-handling-system-bin-plate | 1× | 1 | · | part |
| 1.2 | Hopper Stiffener Rib | ash-handling-system-hopper-stiffener | 6× | 6 | · | part |
| 1.3 | Bin Wear Liner | ash-handling-system-bin-liner | 6× | 6 | · | part |
| 1.4 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 2 | Telescopic Decant Pipe | ash-handling-system-decant-pipe | 4× | 4 | · | part |
| 3 | Underflow Cone | ash-handling-system-underflow-cone | 1× | 1 | · | part |
| 4 | Bin Discharge Gate 2 parts | ash-handling-system-discharge-gate | 2× | 2 | 2 | assembly |
| 4.1 | Knife Gate Blade | ash-handling-system-gate-blade | 1× | 2 | · | part |
| 4.2 | Hydraulic Cylinder | ash-handling-system-hydraulic-cylinder | 1× | 2 | · | part |
| 5 | Bin Vent Filter | ash-handling-system-bin-vent | 1× | 1 | · | part |
| 6 | Bin Wall Vibrator | ash-handling-system-vibrator | 2× | 2 | · | part |
| 7 | Makeup Water Valve | ash-handling-system-makeup-water-valve | 1× | 1 | · | part |
Where the dewatering bin is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |