Structural Support Steel

Assembly

Bolted steel frame carrying the hopper, conveyor incline and dewatering bin under the boiler. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Structural Support Steel parts and their functions

8 top-level parts · 112 parts in total · full bill of materials below
Structural Support Steel parts diagram: 1 support column, 2 cross beam, 3 bracing member, 4 access platform, 5 stair flight, 6 handrail section, 7 column base plate, 8 fastener set. 112 parts in 8 top-level items.
Structural Support Steel parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Support Column 8× Rolled H-section column, S355 steel.
2 Cross Beam 16× I-beam tying columns at platform levels.
3 Bracing Member 24× Angle-section diagonal brace.
4 Access Platform 3 parts 4× Grated maintenance platform around equipment.
5 Stair Flight 3× Bolted steel stair with treads.
6 Handrail Section 20× Galvanized tubular handrail run.
7 Column Base Plate 8× Anchored base plate with holding-down bolts.
8 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Structural Support Steel

8 top-level lines · 11 rows shown · 112 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Support Column ash-handling-system-main-column 8× 8 · part
2 Cross Beam ash-handling-system-cross-beam 16× 16 · part
3 Bracing Member ash-handling-system-bracing 24× 24 · part
4 Access Platform 3 parts ash-handling-system-access-platform 4× 4 8 assembly
4.1 Grating Panel ash-handling-system-grating-panel 6× 24 · part
4.2 Platform Frame ash-handling-system-platform-frame 1× 4 · part
4.3 Fastener Set fastener-set 1× 4 · part
5 Stair Flight ash-handling-system-stair-flight 3× 3 · part
6 Handrail Section ash-handling-system-handrail 20× 20 · part
7 Column Base Plate ash-handling-system-base-plate 8× 8 · part
8 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the structural support steel is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks