BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Work Surface Assembly

Assembly

Perforated stainless steel work deck (800 × 600 mm) allowing downward airflow through work zone and into exhaust plenum below. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Work Surface Assembly parts and their functions

3 top-level parts · 3 parts in total · full bill of materials below
Work Surface Assembly parts diagram: 1 perforated deck, 2 drain collection pan, 3 drain ball valve. 3 parts in 3 top-level items.
Work Surface Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Perforated Deck 1× Perforated stainless 0.5 mm holes 5 mm spacing
2 Drain Collection Pan 1× Removable polyethylene or stainless pan beneath perforations
3 Drain Ball Valve 1× Ball valve on drain pan for spill collection

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Work Surface Assembly

3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Perforated Deck biosafety-cabinet-deck-tray 1× 1 · part
2 Drain Collection Pan biosafety-cabinet-drain-pan 1× 1 · part
3 Drain Ball Valve biosafety-cabinet-drain-valve 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the work surface assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks