BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cold Water Basin

Assembly

Lined basin collecting cooled water, with suction screen, makeup and blowdown. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cold Water Basin parts and their functions

6 top-level parts · 6 parts in total · full bill of materials below
Cold Water Basin parts diagram: 1 basin shell, 2 basin liner, 3 suction screen, 4 makeup valve, 5 overflow and drain, 6 basin strainer. 6 parts in 6 top-level items.
Cold Water Basin parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Basin Shell 1× Concrete or steel basin shell
2 Basin Liner 1× Reinforced membrane liner
3 Suction Screen 1× Outlet anti-vortex suction screen
4 Makeup Valve 1× Float-operated makeup water valve
5 Overflow and Drain 1× Overflow and drain standpipe
6 Basin Strainer 1× Basin sweeper or side-stream strainer

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cold Water Basin

6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Basin Shell cooling-tower-cell-basin-shell 1× 1 · part
2 Basin Liner cooling-tower-cell-basin-liner 1× 1 · part
3 Suction Screen cooling-tower-cell-suction-screen 1× 1 · part
4 Makeup Valve cooling-tower-cell-makeup-valve 1× 1 · part
5 Overflow and Drain cooling-tower-cell-overflow-drain 1× 1 · part
6 Basin Strainer cooling-tower-cell-strainer 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the cold water basin is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks