Hot Water Distribution

Assembly

Header, laterals and spray nozzles spreading hot water evenly across the fill top. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hot Water Distribution parts and their functions

5 top-level parts · 58 parts in total · full bill of materials below
Hot Water Distribution parts diagram: 1 distribution header, 2 distribution lateral, 3 spray nozzle, 4 flow control valve, 5 o-ring set. 58 parts in 5 top-level items.
Hot Water Distribution parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Distribution Header 1× Main hot water header pipe
2 Distribution Lateral 6× Branch laterals from the header
3 Spray Nozzle 48× Non-clog gravity spray nozzles
4 Flow Control Valve 1× Balancing valve at the cell inlet
5 O-Ring Set 2× Seals at pipe flange joints

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hot Water Distribution

5 top-level lines · 5 rows shown · 58 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Distribution Header cooling-tower-cell-distribution-header 1× 1 · part
2 Distribution Lateral cooling-tower-cell-distribution-lateral 6× 6 · part
3 Spray Nozzle cooling-tower-cell-spray-nozzle 48× 48 · part
4 Flow Control Valve cooling-tower-cell-flow-control-valve 1× 1 · part
5 O-Ring Set oring-set 2× 2 · part

Where the hot water distribution is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks