Controller, transfer switch, breaker and instruments. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control and Switchgear parts and their functions

5 top-level parts · 247 parts in total · full bill of materials below
Control and Switchgear parts diagram: 1 genset controller, 2 automatic transfer switch, 3 main circuit breaker, 4 instrument set, 5 control wiring loom. 247 parts in 5 top-level items.
Control and Switchgear parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Genset Controller 5 parts 1× Programmable controller for start, sync and protection.
2 Automatic Transfer Switch 2 parts 1× ATS
3 Main Circuit Breaker 1× Moulded-case output breaker sized to alternator rating.
4 Instrument Set 1× Voltmeter, ammeter, frequency and hours meters.
5 Control Wiring Loom 2 parts 1× Sensor and control harness.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control and Switchgear

5 top-level lines · 14 rows shown · 247 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Genset Controller 5 parts diesel-genset-container-genset-controller 1× 1 211 assembly
1.1 Bare PCB pcb-bare 1× 1 · part
1.2 Microcontroller mcu 1× 1 · part
1.3 LCD Panel lcd-panel 1× 1 · part
1.4 Relay relay 8× 8 · part
1.5 SMD Passive (R/C/L) smd-passives 200× 200 · part
2 Automatic Transfer Switch 2 parts diesel-genset-container-transfer-switch 1× 1 3 assembly
2.1 ATS Power Contactor diesel-genset-container-ats-contactor 2× 2 · part
2.2 ATS Logic Module diesel-genset-container-ats-controller 1× 1 · part
3 Main Circuit Breaker diesel-genset-container-main-breaker 1× 1 · part
4 Instrument Set diesel-genset-container-instrument-set 1× 1 · part
5 Control Wiring Loom 2 parts diesel-genset-container-control-wiring 1× 1 31 assembly
5.1 Wire Bundle wire-bundle 1× 1 · part
5.2 Connector connector 30× 30 · part

Something wrong in this list? Report a problem with this BOM.

Where the control and switchgear is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$300. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Sona Comstar
sonacomstar.com ↗
Gurugram, IN EV driveline & motors 1,000 pcs 8–12 wks
shdrive.cn ↗ Yuhuan, CN Gears & driveline 1,000 pcs 8–12 wks
🇮🇳Bharat Gears
bharatgears.com ↗
Mumbai, IN Automotive gears 1,000 pcs 8–12 wks
🇮🇳ZF India
zf.com ↗
Pune, IN Driveline & chassis 1,000 pcs 8–12 wks
advancegroup.cn ↗ Hangzhou, CN Gearboxes 1,000 pcs 8–12 wks