Terminations
AssemblyHV and LV terminal connections with insulators and surge clearances. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Terminations parts and their functions
5 top-level parts · 22 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | HV Terminal | 3× | HV terminal with stand-off insulator |
| 2 | LV Busbar | 4× | LV connection busbars including neutral |
| 3 | Stand-Off Insulator | 6× | Epoxy stand-off insulators |
| 4 | Cable Lug | 8× | Cable lugs for incoming and outgoing cables |
| 5 | Neutral Earthing Link | 1× | Neutral earthing link |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Terminations
5 top-level lines · 5 rows shown · 22 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | HV Terminal | dry-type-transformer-hv-terminal | 3× | 3 | · | part |
| 2 | LV Busbar | dry-type-transformer-lv-busbar | 4× | 4 | · | part |
| 3 | Stand-Off Insulator | dry-type-transformer-standoff-insulator | 6× | 6 | · | part |
| 4 | Cable Lug | cable-lug | 8× | 8 | · | part |
| 5 | Neutral Earthing Link | dry-type-transformer-neutral-link | 1× | 1 | · | part |
Where the terminations is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |