Absorber Tower Assembly

Assembly

Vertical countercurrent vessel holding the integral reaction tank where SO2 is absorbed into limestone slurry. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Absorber Tower Assembly parts and their functions

7 top-level parts · 17 parts in total · full bill of materials below
Absorber Tower Assembly parts diagram: 1 absorber tower shell, 2 reaction tank, 3 side-entry agitator, 4 perforated contact tray, 5 wall ring, 6 glass-flake lining, 7 inspection manway. 17 parts in 7 top-level items.
Absorber Tower Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Absorber Tower Shell 1× Rubber-lined or alloy-clad carbon steel vessel shell
2 Reaction Tank 1× Integral lower sump holding the recirculating slurry inventory
3 Side-Entry Agitator 4× Side-entry agitators keeping solids suspended in the reaction tank
4 Perforated Contact Tray 1× Optional sieve tray increasing gas-liquid contact
5 Wall Ring 6× Wall rings preventing gas bypass along the vessel wall
6 Glass-Flake Lining 1× Glass-flake or rubber corrosion lining on wetted surfaces
7 Inspection Manway 3× Bolted access manways for internal inspection

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Absorber Tower Assembly

7 top-level lines · 7 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Absorber Tower Shell flue-gas-desulfurization-scrubber-tower-shell 1× 1 · part
2 Reaction Tank flue-gas-desulfurization-scrubber-reaction-tank 1× 1 · part
3 Side-Entry Agitator flue-gas-desulfurization-scrubber-side-agitator 4× 4 · part
4 Perforated Contact Tray flue-gas-desulfurization-scrubber-perforated-tray 1× 1 · part
5 Wall Ring flue-gas-desulfurization-scrubber-wall-rings 6× 6 · part
6 Glass-Flake Lining flue-gas-desulfurization-scrubber-flake-lining 1× 1 · part
7 Inspection Manway flue-gas-desulfurization-scrubber-manway 3× 3 · part

Something wrong in this list? Report a problem with this BOM.

Where the absorber tower assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks