BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Main Bus Bars

Assembly

Three-phase copper or aluminum bus carrying generator output to loads, rated for peak current and thermal cycling. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Main Bus Bars parts and their functions

4 top-level parts · 19 parts in total · full bill of materials below
Main Bus Bars parts diagram: 1 bus bars, 2 bus insulators, 3 compression lugs, 4 grounding bus. 19 parts in 4 top-level items.
Main Bus Bars parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bus Bars 3× Copper or aluminum bar stock, calculated for peak current with <10 °C rise
2 Bus Insulators 6× Porcelain or epoxy rod insulators supporting bus above enclosure floor
3 Compression Lugs 9× Compression lug connections (3 phases × 3 connection points) with torque specs
4 Grounding Bus 1× Copper grounding bus connected to facility ground rod via main ground lug

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Main Bus Bars

4 top-level lines · 4 rows shown · 19 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bus Bars generator-paralleling-bus-bars 3× 3 · part
2 Bus Insulators generator-paralleling-bus-insulators 6× 6 · part
3 Compression Lugs generator-paralleling-bus-connectors 9× 9 · part
4 Grounding Bus generator-paralleling-bus-grounding 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the main bus bars is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Motherson
motherson.com ↗
Noida, IN Wiring harness & modules 1,000 sets 4–6 wks
🇮🇳Polycab
polycab.com ↗
Mumbai, IN Wires & cables 1,000 sets 4–6 wks
🇨🇳Luxshare
luxshare-ict.com ↗
Dongguan, CN Connectors & cables 1,000 sets 4–6 wks
🇨🇳Hengtong
hengtonggroup.com ↗
Suzhou, CN Cables 1,000 sets 4–6 wks
🇮🇳Finolex
finolex.com ↗
Pune, IN Wires & cables 1,000 sets 4–6 wks