Press-Pack Clamp
AssemblySpring-loaded clamp pressing thyristor and heat sinks together at controlled force. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Press-Pack Clamp parts and their functions
3 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Coil Spring | 2× | Helical spring of round steel wire that stores energy in compression or extension, used for suspension, return force, and preload. |
| 2 | Clamp Plate | 2× | Rigid plate distributing the clamping force evenly across the press-pack. |
| 3 | Insulating Tie Rod | 4× | Glass-fiber rod tensioning the clamp while insulating the stack. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Press-Pack Clamp
3 top-level lines · 3 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Coil Spring | coil-spring | 2× | 2 | · | part |
| 2 | Clamp Plate | hcv-clamp-plate | 2× | 2 | · | part |
| 3 | Insulating Tie Rod | hcv-insulating-tie-rod | 4× | 4 | · | part |
Where the press-pack clamp is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$500. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳CATL
catl.com ↗
|
Ningde, CN | Li-ion cell & pack maker | 5,000 cells | 8–12 wks |
| evebattery.com ↗ | Huizhou, CN | Li-ion cell maker | 5,000 cells | 8–12 wks |
| amararaja.com ↗ | Tirupati, IN | Batteries & energy | 5,000 cells | 8–12 wks |
| durapowergroup.com ↗ | Singapore | Li-ion battery systems | 5,000 cells | 8–12 wks |
|
🇨🇳BYD
byd.com ↗
|
Shenzhen, CN | EV & battery manufacturer | 5,000 cells | 8–12 wks |