BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Housing

Assembly

Clamshell acoustic enclosure that ducts cooling air and drops noise to 58 dB(A) at 7 m. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Housing parts and their functions

6 top-level parts · 10 parts in total · full bill of materials below
Housing parts diagram: 1 shell half, 2 carry handle, 3 rubber foot, 4 maintenance cover, 5 air intake duct, 6 fastener set. 10 parts in 6 top-level items.
Housing parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Shell Half 2× Moulded PP clamshell
2 Carry Handle 1× Integral top handle for one-hand carrying of the 21 kg unit.
3 Rubber Foot 4× Vibration-isolating foot decoupling engine vibration from the ground.
4 Maintenance Cover 1× Side access panel for spark plug and oil-fill service.
5 Air Intake Duct 1× Labyrinth duct that admits cooling air while blocking direct noise paths.
6 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Housing

6 top-level lines · 6 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Shell Half inverter-generator-shell-half 2× 2 · part
2 Carry Handle inverter-generator-carry-handle 1× 1 · part
3 Rubber Foot inverter-generator-rubber-foot 4× 4 · part
4 Maintenance Cover inverter-generator-maintenance-cover 1× 1 · part
5 Air Intake Duct inverter-generator-air-intake-duct 1× 1 · part
6 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the housing is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks