Magnetic Core
AssemblyThree-limb stacked or toroidal core of grain-oriented silicon steel sized for low no-load loss and low magnetising current. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Magnetic Core parts and their functions
6 top-level parts · 15 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | GO Silicon-Steel Lamination | 1× | Grain-oriented silicon-steel sheet |
| 2 | Core Limb | 3× | Wound limb |
| 3 | Core Yoke | 2× | Yoke closing the magnetic circuit |
| 4 | Core Clamping Frame | 4× | Steel clamping frame |
| 5 | Core Banding | 4× | Glass-banding holding the stack |
| 6 | Core Ground Strap | 1× | Single-point core earthing strap |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Magnetic Core
6 top-level lines · 6 rows shown · 15 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | GO Silicon-Steel Lamination | isolation-transformer-core-lamination | 1× | 1 | · | part |
| 2 | Core Limb | isolation-transformer-core-limb | 3× | 3 | · | part |
| 3 | Core Yoke | isolation-transformer-core-yoke | 2× | 2 | · | part |
| 4 | Core Clamping Frame | isolation-transformer-core-clamp | 4× | 4 | · | part |
| 5 | Core Banding | isolation-transformer-core-band | 4× | 4 | · | part |
| 6 | Core Ground Strap | isolation-transformer-core-ground-strap | 1× | 1 | · | part |
Where the magnetic core is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$20. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳JL MAG
jlmag.com.cn ↗
|
Ganzhou, CN | Rare-earth magnets | 5,000 pcs | 6–10 wks |
| zhmag.com ↗ | Yantai, CN | NdFeB magnets | 5,000 pcs | 6–10 wks |
| china-ys.com ↗ | Ningbo, CN | NdFeB magnets | 5,000 pcs | 6–10 wks |
| sanhuanmagnetics.com ↗ | Beijing, CN | Rare-earth magnets | 5,000 pcs | 6–10 wks |
| earth-panda.com ↗ | Hefei, CN | NdFeB magnets | 5,000 pcs | 6–10 wks |