Enclosure and Cooling
AssemblyVentilated or sealed enclosure carrying the active part, with natural-air or fan cooling depending on rating. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Enclosure and Cooling parts and their functions
7 top-level parts · 17 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Enclosure Housing | 1× | Steel enclosure |
| 2 | Mounting Base | 1× | Mounting base and feet |
| 3 | Ventilation Louver | 4× | Ventilation louver |
| 4 | Cooling Fan | 2× | Optional forced-air cooling fan |
| 5 | Sheet Metal Panel | 4× | Enclosure panel |
| 6 | Fastener Set | 1× | Assembly hardware |
| 7 | Coil Spring | 4× | Anti-vibration mount |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Enclosure and Cooling
7 top-level lines · 7 rows shown · 17 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Enclosure Housing | isolation-transformer-housing | 1× | 1 | · | part |
| 2 | Mounting Base | isolation-transformer-mounting-base | 1× | 1 | · | part |
| 3 | Ventilation Louver | isolation-transformer-vent-louver | 4× | 4 | · | part |
| 4 | Cooling Fan | isolation-transformer-cooling-fan | 2× | 2 | · | part |
| 5 | Sheet Metal Panel | sheet-panel | 4× | 4 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 7 | Coil Spring | coil-spring | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the enclosure and cooling is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |