Control Panel
AssemblyThe panel and drive that run the blower, hold the set vacuum, and trip the skid on alarm. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Control Panel
7 top-level lines as of r95144| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | PLC 4 parts | landfill-gas-blower-skid-plc | 1× | 1 | 0 | assembly |
| 2 | Variable Frequency Drive | landfill-gas-blower-skid-vfd | 1× | 1 | · | part |
| 3 | Power Supply | power-supply | 1× | 1 | · | part |
| 4 | Operator HMI | landfill-gas-blower-skid-hmi | 1× | 1 | · | part |
| 5 | Relay | relay | 4× | 4 | · | part |
| 6 | Panel Enclosure | landfill-gas-blower-skid-panel-enclosure | 1× | 1 | · | part |
| 7 | Wire Bundle | wire-bundle | 1× | 1 | · | part |