BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Condensate Knockout

Assembly

The vessel and pump that drop and drain the water carried in the warm, wet landfill gas. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Condensate Knockout parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Condensate Knockout parts diagram: 1 knockout vessel, 2 mist eliminator, 3 condensate pump, 4 level switch, 5 drain valve. 6 parts in 5 top-level items.
Condensate Knockout parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Knockout Vessel 1× Knockout vessel
2 Mist Eliminator 1× Mist eliminator
3 Condensate Pump 1× Condensate pump
4 Level Switch 2× Level switches
5 Drain Valve 1× Auto drain valve

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Condensate Knockout

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Knockout Vessel landfill-gas-blower-skid-knockout-vessel 1× 1 · part
2 Mist Eliminator landfill-gas-blower-skid-demister 1× 1 · part
3 Condensate Pump landfill-gas-blower-skid-drain-pump 1× 1 · part
4 Level Switch landfill-gas-blower-skid-level-switch 2× 2 · part
5 Drain Valve landfill-gas-blower-skid-drain-valve 1× 1 · part

Where the condensate knockout is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks