BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Drying Chamber

Assembly

A clear acrylic or stainless manifold of heated shelves where the frozen samples sit; gentle shelf heating supplies the latent heat that sublimation removes. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Drying Chamber parts and their functions

6 top-level parts · 18 parts in total · full bill of materials below
Drying Chamber parts diagram: 1 chamber body, 2 heated shelf, 3 heating element, 4 manifold port, 5 chamber gasket, 6 o-ring set. 18 parts in 6 top-level items.
Drying Chamber parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Chamber Body 1× Chamber manifold
2 Heated Shelf 3× Heated sample shelves
3 Heating Element 3× Shelf heaters
4 Manifold Port 8× Flask manifold ports
5 Chamber Gasket 1× Vacuum gasket
6 O-Ring Set 2× Port seals

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Drying Chamber

6 top-level lines · 6 rows shown · 18 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Chamber Body lyo-chamber-body 1× 1 · part
2 Heated Shelf lyo-shelf 3× 3 · part
3 Heating Element heating-element 3× 3 · part
4 Manifold Port lyo-manifold-port 8× 8 · part
5 Chamber Gasket lyo-chamber-gasket 1× 1 · part
6 O-Ring Set oring-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the drying chamber is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks