BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Oil-Free Compressor

Assembly

Two-stage reciprocating compressor delivering 5–10 bar air, oil-free design for lab-grade purity. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Oil-Free Compressor parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Oil-Free Compressor parts diagram: 1 electric drive motor, 2 two-stage piston head, 3 intake air filter, 4 one-way check valve, 5 unload idle solenoid valve. 6 parts in 5 top-level items.
Oil-Free Compressor parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Electric Drive Motor 1× 2 kW 3-phase or 1.5 kW single-phase electric
2 Two-Stage Piston Head 1× Two-stage piston block with Teflon seals
3 Intake Air Filter 1× 5 μm particle pre-filter, silica-gel desiccant
4 One-Way Check Valve 2× One-way discharge check valves, first/second stage
5 Unload Idle Solenoid Valve 1× Solenoid idle valve reducing energy when storage full

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Oil-Free Compressor

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Electric Drive Motor nitrogen-main-motor 1× 1 · part
2 Two-Stage Piston Head nitrogen-compressor-head 1× 1 · part
3 Intake Air Filter nitrogen-intake-filter 1× 1 · part
4 One-Way Check Valve nitrogen-check-valve 2× 2 · part
5 Unload Idle Solenoid Valve nitrogen-unload-solenoid 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the oil-free compressor is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks