BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Telescope Assembly

Assembly

Erect-image refractor with 32× magnification, 1° field of view, and etched reticle for rod and distance measurement. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Telescope Assembly parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Telescope Assembly parts diagram: 1 lens assembly, 2 reticle pattern, 3 eyepiece lens, 4 coil spring. 4 parts in 4 assemblies.
Telescope Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Lens Assembly Objective lens 50 mm diameter
2 Reticle Pattern Etched stadia hairs and crosshair
3 Eyepiece Lens Wide-field eyepiece with adjustment range
4 Coil Spring Focusing helical spring mechanism

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Telescope Assembly

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Lens Assembly camera-lens 1 · part
2 Reticle Pattern optical-level-reticle 1 · part
3 Eyepiece Lens optical-level-eyepiece 1 · part
4 Coil Spring coil-spring 1 · part

Where the telescope assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳JLCPCB
jlcpcb.com ↗
Shenzhen, CN PCB fabrication 100 pcs 2–4 wks
🇨🇳PCBWay
pcbway.com ↗
Shenzhen, CN PCB fab & assembly 100 pcs 2–4 wks
scc.com.cn ↗ Shenzhen, CN PCB manufacturer 100 pcs 2–4 wks
shogini.com ↗ Mumbai, IN PCB manufacturer 100 pcs 2–4 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 100 pcs 2–4 wks