BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Shaker Platform Deck

Assembly

400 × 300 mm cast-iron platform with 4 side-mounted clamp fixtures securing flasks up to 2 L. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Shaker Platform Deck parts and their functions

4 top-level parts · 13 parts in total · full bill of materials below
Shaker Platform Deck parts diagram: 1 cast-iron platform, 2 clamp post column, 3 spring-loaded flask clamp, 4 rubber isolation mount. 13 parts in 4 top-level items.
Shaker Platform Deck parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cast-Iron Platform 1× Ductile iron 30 kg casting, anti-vibration texture
2 Clamp Post Column 4× Stainless steel vertical clamp columns
3 Spring-Loaded Flask Clamp 4× Lever-actuated grip clamps for flask necks (spring-loaded)
4 Rubber Isolation Mount 4× Rubber-isolated mounting studs to frame

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Shaker Platform Deck

4 top-level lines · 4 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cast-Iron Platform orbital-deck-casting 1× 1 · part
2 Clamp Post Column orbital-clamp-post 4× 4 · part
3 Spring-Loaded Flask Clamp orbital-flask-clamp 4× 4 · part
4 Rubber Isolation Mount orbital-deck-mounting-boss 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the shaker platform deck is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks