BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Sample Conditioning Module

Assembly

Inlet filter, humidity trap, and flow regulation for sample gas or liquid. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Sample Conditioning Module parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Sample Conditioning Module parts diagram: 1 inlet filter, 2 humidity trap, 3 flow meter, 4 flow control valve, 5 sample probe. 5 parts in 5 top-level items.
Sample Conditioning Module parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Inlet Filter 1× 1 µm sintered filter blocking particles.
2 Humidity Trap 1× Silica-gel or molecular-sieve cartridge.
3 Flow Meter 1× Float rotameter 0–1 L/min range.
4 Flow Control Valve 1× Needle valve setting sample flow.
5 Sample Probe 1× Stainless steel suction line.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Sample Conditioning Module

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Inlet Filter oxygen-analyzer-inlet-filter 1× 1 · part
2 Humidity Trap oxygen-analyzer-humidity-trap 1× 1 · part
3 Flow Meter oxygen-analyzer-flow-meter 1× 1 · part
4 Flow Control Valve oxygen-analyzer-flow-control-valve 1× 1 · part
5 Sample Probe oxygen-analyzer-sample-probe 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the sample conditioning module is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks