BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Bushing Assembly

Assembly

Ceramic or epoxy-resin insulators with embedded conductors passing high and low-voltage lines through tank walls and providing cable termination points. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bushing Assembly parts and their functions

3 top-level parts · 10 parts in total · full bill of materials below
Bushing Assembly parts diagram: 1 high-voltage bushing, 2 low-voltage bushing, 3 bushing clamp and support. 10 parts in 3 top-level items.
Bushing Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 High-Voltage Bushing 2× Primary voltage (2–3 phase) entrance
2 Low-Voltage Bushing 3× Secondary voltage line and neutral
3 Bushing Clamp and Support 5× Mechanical mounting and cable retention

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Bushing Assembly

3 top-level lines · 3 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 High-Voltage Bushing pad-mounted-transformer-hv-bushing 2× 2 · part
2 Low-Voltage Bushing pad-mounted-transformer-lv-bushing 3× 3 · part
3 Bushing Clamp and Support pad-mounted-transformer-bushing-clamps 5× 5 · part

Something wrong in this list? Report a problem with this BOM.

Where the bushing assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks