Gapped Magnetic Core
AssemblyCore whose limbs are split into packets by non-magnetic gaps, so the inductance is set by the gaps and the reactor draws a stable, nearly linear magnetising current. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Gapped Magnetic Core parts and their functions
8 top-level parts · 66 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | GO Silicon-Steel Lamination | 1× | Grain-oriented silicon-steel sheet |
| 2 | Core Packet | 12× | Core packet between gaps |
| 3 | Non-Magnetic Gap Spacer | 30× | Non-magnetic gap spacer |
| 4 | Core Yoke | 2× | Yoke closing the magnetic circuit |
| 5 | Core Clamping Frame | 4× | Steel clamping frame |
| 6 | High-Tension Tie Rod | 8× | High-tension tie rod compressing the gapped stack |
| 7 | Magnetic Flux Shield | 8× | Magnetic shield reducing stray-flux loss |
| 8 | Core Ground Strap | 1× | Single-point core earthing strap |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Gapped Magnetic Core
8 top-level lines · 8 rows shown · 66 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | GO Silicon-Steel Lamination | shunt-reactor-core-lamination | 1× | 1 | · | part |
| 2 | Core Packet | shunt-reactor-core-packet | 12× | 12 | · | part |
| 3 | Non-Magnetic Gap Spacer | shunt-reactor-air-gap-spacer | 30× | 30 | · | part |
| 4 | Core Yoke | shunt-reactor-core-yoke | 2× | 2 | · | part |
| 5 | Core Clamping Frame | shunt-reactor-core-clamp | 4× | 4 | · | part |
| 6 | High-Tension Tie Rod | shunt-reactor-core-tie-rod | 8× | 8 | · | part |
| 7 | Magnetic Flux Shield | shunt-reactor-flux-shield | 8× | 8 | · | part |
| 8 | Core Ground Strap | shunt-reactor-core-ground-strap | 1× | 1 | · | part |
Where the gapped magnetic core is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$20. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳JL MAG
jlmag.com.cn ↗
|
Ganzhou, CN | Rare-earth magnets | 5,000 pcs | 6–10 wks |
| zhmag.com ↗ | Yantai, CN | NdFeB magnets | 5,000 pcs | 6–10 wks |
| china-ys.com ↗ | Ningbo, CN | NdFeB magnets | 5,000 pcs | 6–10 wks |
| sanhuanmagnetics.com ↗ | Beijing, CN | Rare-earth magnets | 5,000 pcs | 6–10 wks |
| earth-panda.com ↗ | Hefei, CN | NdFeB magnets | 5,000 pcs | 6–10 wks |