BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Protection and Monitoring

Assembly

Buchholz, pressure relief, sudden-pressure, temperature, and vibration monitoring guarding the reactor; turn-to-turn faults are hard to see, so monitoring matters. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Protection and Monitoring parts and their functions

8 top-level parts · 11 parts in total · full bill of materials below
Protection and Monitoring parts diagram: 1 buchholz relay, 2 pressure-relief device, 3 sudden-pressure relay, 4 winding temperature indicator, 5 top-oil temperature indicator, 6 tank vibration sensor, 7 pressure sensor, 8 online DGA monitor. 11 parts in 8 top-level items.
Protection and Monitoring parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Buchholz Relay 1× Buchholz relay
2 Pressure-Relief Device 1× Pressure-relief device
3 Sudden-Pressure Relay 1× Sudden-pressure relay
4 Winding Temperature Indicator 2× Winding temperature indicator
5 Top-Oil Temperature Indicator 1× Top-oil temperature indicator
6 Tank Vibration Sensor 2× Tank vibration sensor
7 Pressure Sensor 2× Oil pressure sensor
8 Online DGA Monitor 1× Online dissolved-gas monitor

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Protection and Monitoring

8 top-level lines · 8 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Buchholz Relay shunt-reactor-buchholz 1× 1 · part
2 Pressure-Relief Device shunt-reactor-pressure-relief 1× 1 · part
3 Sudden-Pressure Relay shunt-reactor-sudden-pressure-relay 1× 1 · part
4 Winding Temperature Indicator shunt-reactor-winding-temp 2× 2 · part
5 Top-Oil Temperature Indicator shunt-reactor-oil-temp 1× 1 · part
6 Tank Vibration Sensor shunt-reactor-vibration-sensor 2× 2 · part
7 Pressure Sensor pressure-sensor 2× 2 · part
8 Online DGA Monitor shunt-reactor-dga-monitor 1× 1 · part

Where the protection and monitoring is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $3–$400. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳BOE
boe.com ↗
Beijing, CN Display panels 1,000 pcs 6–10 wks
🇨🇳Tianma
tianma.com ↗
Shenzhen, CN Display panels 1,000 pcs 6–10 wks
🇨🇳TCL CSOT
szcsot.com ↗
Shenzhen, CN Display panels 1,000 pcs 6–10 wks
🇨🇳Truly Opto
truly.net ↗
Shanwei, CN Displays & camera modules 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks