Switching Valve
AssemblyThe power valve: IGBT power modules on a heatsink, driven by a gate driver board, that phase-control the reactor current. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Switching Valve parts and their functions
4 top-level parts · 115 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | IGBT Power Module | 6× | IGBT power module, two per phase |
| 2 | Heatsink | 6× | Heatsink per module |
| 3 | Gate Driver Board 3 parts | 1× | Gate driver board |
| 4 | Snubber | 6× | Snubber per module |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Switching Valve
4 top-level lines · 7 rows shown · 115 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | IGBT Power Module | igbt-module | 6× | 6 | · | part |
| 2 | Heatsink | svc-heatsink | 6× | 6 | · | part |
| 3 | Gate Driver Board 3 parts | svc-gate-driver | 1× | 1 | 97 | assembly |
| 3.1 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 3.2 | Gate Driver IC | gate-driver-ic | 6× | 6 | · | part |
| 3.3 | SMD Passive (R/C/L) | smd-passives | 90× | 90 | · | part |
| 4 | Snubber | svc-snubber | 6× | 6 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the switching valve is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |