Tower Body
AssemblyTapered lattice trunk built from four legs braced by triangulated panels, transferring all loads to the foundations. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Tower Body parts and their functions
6 top-level parts · 13 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Leg Member | 4× | Main corner leg angles |
| 2 | Bracing Member | 1× | Diagonal and horizontal bracing |
| 3 | Redundant Member | 1× | Anti-buckling redundant bars |
| 4 | Gusset Plate | 1× | Connection gusset plates |
| 5 | Leg Stub Extension | 4× | Adjustable leg stub extensions |
| 6 | Fastener Set | 2× | High-strength bolting |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Tower Body
6 top-level lines · 6 rows shown · 13 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Leg Member | ttl-leg-member | 4× | 4 | · | part |
| 2 | Bracing Member | ttl-bracing-member | 1× | 1 | · | part |
| 3 | Redundant Member | ttl-redundant-member | 1× | 1 | · | part |
| 4 | Gusset Plate | ttl-gusset-plate | 1× | 1 | · | part |
| 5 | Leg Stub Extension | ttl-leg-extension | 4× | 4 | · | part |
| 6 | Fastener Set | fastener-set | 2× | 2 | · | part |
Where the tower body is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |