Cold Trap
AssemblyCondenser chamber (often liquid-nitrogen cooled) capturing evaporated solvent before pump inlet. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cold Trap parts and their functions
5 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Condenser Coil | 1× | Copper or aluminum coil, large surface area |
| 2 | Cold Finger | 1× | Finger-like projection for direct vapor contact |
| 3 | Cold Bath | 1× | Liquid nitrogen or ethanol/dry-ice reservoir |
| 4 | Trap Drain | 1× | Valve for periodic emptying of condensed liquid |
| 5 | SMD Passive (R/C/L) | 2× | Thermal contact compound |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cold Trap
5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Condenser Coil | vacuum-concentrator-condenser-coil | 1× | 1 | · | part |
| 2 | Cold Finger | vacuum-concentrator-cold-finger | 1× | 1 | · | part |
| 3 | Cold Bath | vacuum-concentrator-cold-bath | 1× | 1 | · | part |
| 4 | Trap Drain | vacuum-concentrator-trap-drain | 1× | 1 | · | part |
| 5 | SMD Passive (R/C/L) | smd-passives | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cold trap is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |