Structural Support Steel
AssemblyBolted steel frame carrying the hopper, conveyor incline and dewatering bin under the boiler. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Structural Support Steel
8 top-level lines as of r6682| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Support Column | ash-handling-system-main-column | 8× | 8 | · | part |
| 2 | Cross Beam | ash-handling-system-cross-beam | 16× | 16 | · | part |
| 3 | Bracing Member | ash-handling-system-bracing | 24× | 24 | · | part |
| 4 | Access Platform 3 parts | ash-handling-system-access-platform | 4× | 4 | 0 | assembly |
| 5 | Stair Flight | ash-handling-system-stair-flight | 3× | 3 | · | part |
| 6 | Handrail Section | ash-handling-system-handrail | 20× | 20 | · | part |
| 7 | Column Base Plate | ash-handling-system-base-plate | 8× | 8 | · | part |
| 8 | Fastener Set | fastener-set | 1× | 1 | · | part |