This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Reagent Storage and Dosing

Assembly

Urea or aqueous ammonia storage with a urea-to-ammonia conversion stage and metering pumps. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Reagent Storage and Dosing parts and their functions

13 top-level parts · 24 parts in total · full bill of materials below
Reagent Storage and Dosing parts diagram: 1 reagent storage tank, 2 tank heater, 3 dosing pump, 4 dosing skid, 5 urea decomposition chamber, 6 dilution air blower, 7 reagent mixing lance, 8 flow control valve, 9 pressure sensor, 10 heating element, 11 ball bearing, 12 oil seal, 13 o-ring set. 24 parts in 13 top-level items.
Reagent Storage and Dosing parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Reagent Storage Tank 1× Insulated tank for 40% urea or 19% aqueous ammonia
2 Tank Heater 1× Tank heater keeping urea above its 0 °C freeze point
3 Dosing Pump 2× Metering pumps delivering reagent at controlled rate
4 Dosing Skid 1× Piping skid with strainers and flow control
5 Urea Decomposition Chamber 1× Heated chamber converting urea to ammonia, CO2, and water
6 Dilution Air Blower 1× Blower supplying dilution air to the ammonia stream
7 Reagent Mixing Lance 4× Lances metering reagent into the dilution duct
8 Flow Control Valve 2× Control valves trimming reagent and air flow
9 Pressure Sensor 2× Tank and discharge pressure sensors
10 Heating Element 2× Trace heating elements on reagent lines
11 Ball Bearing 4× Dosing pump shaft bearings
12 Oil Seal 2× Dosing pump shaft seals
13 O-Ring Set 1× Pump and valve sealing set

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Reagent Storage and Dosing

13 top-level lines · 13 rows shown · 24 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Reagent Storage Tank selective-catalytic-reduction-unit-reagent-tank 1× 1 · part
2 Tank Heater selective-catalytic-reduction-unit-tank-heater 1× 1 · part
3 Dosing Pump selective-catalytic-reduction-unit-dosing-pump 2× 2 · part
4 Dosing Skid selective-catalytic-reduction-unit-dosing-skid 1× 1 · part
5 Urea Decomposition Chamber selective-catalytic-reduction-unit-decomposition-chamber 1× 1 · part
6 Dilution Air Blower selective-catalytic-reduction-unit-dilution-blower 1× 1 · part
7 Reagent Mixing Lance selective-catalytic-reduction-unit-mixing-lance 4× 4 · part
8 Flow Control Valve selective-catalytic-reduction-unit-flow-control-valve 2× 2 · part
9 Pressure Sensor pressure-sensor 2× 2 · part
10 Heating Element heating-element 2× 2 · part
11 Ball Bearing ball-bearing 4× 4 · part
12 Oil Seal oil-seal 2× 2 · part
13 O-Ring Set oring-set 1× 1 · part

Where the reagent storage and dosing is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks