BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Conveyor System

Assembly

Belts or apron conveyors move separated material to stockpiles or next stage. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Conveyor System parts and their functions

4 top-level parts · 12 parts in total · full bill of materials below
Conveyor System parts diagram: 1 oversize conveyor, 2 intermediate conveyor, 3 conveyor motor, 4 idler roller assembly. 12 parts in 4 top-level items.
Conveyor System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Oversize Conveyor 1× Oversize (coarse) material conveyor (1.5m wide)
2 Intermediate Conveyor 2× Intermediate size conveyors
3 Conveyor Motor 3× Drive motors (10–15kW each)
4 Idler Roller Assembly 6× Idler rollers and frame supports

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Conveyor System

4 top-level lines · 4 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Oversize Conveyor aggregate-screening-plant-belt-conveyor-a 1× 1 · part
2 Intermediate Conveyor aggregate-screening-plant-belt-conveyor-b 2× 2 · part
3 Conveyor Motor aggregate-screening-plant-conveyor-motors 3× 3 · part
4 Idler Roller Assembly aggregate-screening-plant-conveyor-supports 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the conveyor system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks