Wall Formwork

Product

Also known as: panel formwork, wall shutter, concrete wall form

Overview

Wall formwork is the temporary mould that shapes and supports fresh concrete until it cures into a structural wall. Modular panel systems (the type made by Peri, Doka, MEVA and similar suppliers) build that mould from standardised steel-framed panels that clip together with wedge clamps and are held against concrete pressure by through-wall ties. A crew can erect, pour, strip and re-set the same panels many times across a project, which is why the panel system has largely replaced loose timber formwork on walls of any repetition.

The full mould is a balanced pair of wall faces. Two lines of Framed wall panel stand opposite each other at the wall thickness, the gap fixed by the Form tie assembly that passes through both faces. Everything else on the bill of materials exists to close the form at corners and ends, keep the faces flat and plumb, and let the crew work safely at the pour height.

Panels and formface

The Framed wall panel is the repeating unit, 2.7 m high by 0.9 m wide in the standard module. Its Steel panel frame profile is a closed welded perimeter, 120 mm deep, that collects concrete pressure from the face and delivers it to the ties and clamps along its edges. Inside the perimeter, several Cross stiffening rib members stiffen the panel so the face does not bow between ties. The concrete-facing surface is the Plywood formface sheet, an 18 mm phenolic film-faced birch plywood that gives a smooth fair-faced finish and survives repeated pours before it needs replacing. Each panel edge carries an Panel edge rail with clamp slots and pre-set tie holes; the holes are lined with a hardened Tie-hole sleeve so repeated tie use does not elongate them. A pair of Panel lifting eye points let the crane move whole panels or ganged panel sets.

Walls are rarely a whole number of modules long or perfectly orthogonal, so the system carries dedicated closure units. The Inside corner panel and Outside corner panel form re-entrant and external 90-degree corners; both wrap a Plywood formface sheet over a welded Corner frame profile, with the outside corner adding a Corner tie bracket to pick up corner ties. The Stop-end panel closes the vertical end of a pour or a construction joint, using a width-adjustable Stop-end frame to match the wall thickness and a Stop-end clamp to hold it against end pressure.

Ties and clamps

Form ties carry the load. As concrete is placed it behaves as a liquid, and the lateral pressure on the face rises with pour rate and depth. Panel systems are typically rated for an allowable fresh-concrete pressure of 60 to 80 kN/m2, and the Form tie assembly is what holds the two faces against that pressure. Its core is a coarse-threaded Tie rod (a Dywidag-type bar with a working load around 120 kN) passing through both panels. A Tie wing nut on each end bears on a Tie counter plate that spreads the load into the waler or frame. A Tie spacer cone at each face sets the wall thickness and leaves a tapered recess that is patched after stripping, while a lost Tie sleeve tube keeps the rod free of concrete so it can be withdrawn and reused. For water-retaining walls a Tie water stop at mid-thickness blocks the seepage path along the tie.

Panels are joined to each other by the Panel wedge clamp, a wedge connector. Its Clamp body hooks over both Panel edge rail sections and a hammer-driven Clamp wedge pulls them together, drawing the formface seam tight and aligning the faces; a Clamp jaw takes the joint-opening force and the wedge holds by friction. Where a wall length does not divide into whole modules, an Adjustable compensation clamp with a screw Clamp adjustment screw closes the gap and a Filler waling bridges the opening between two panels.

Bracing and platforms

Flatness across a run of panels comes from the Waler alignment beam, a twin-channel Waler beam section clamped across several panels by Waler clamp hooks and joined end to end by a Waler connecting pin. The waler ties the panels into one stiff line so the wall face does not step at the joints.

The whole assembly is plumbed and braced by the Push-pull prop, a raker that runs from the panel down to the slab. Its telescopic Prop tube sets the coarse length and a Prop turnbuckle makes the fine adjustment used to bring the wall to plumb. The prop connects to the panel through a Prop panel shoe and lands on a Prop base plate fixed to the floor by a Base anchor bolt. Two props per panel line, set roughly square to the wall, resist wind and the out-of-balance forces during placement.

Crews work the pour from a platform hung on the form. The Working platform bracket folds out from the panel on a Bracket arm carried by a Bracket panel hook, and supports a Platform deck board walking surface. A Guardrail post holds the Guardrail rail at top and mid height, and a Toe board stops tools dropping off the edge. The Access ladder, built from two Ladder stile rails, ten Ladder rung steps and a top Ladder hook, gives the climb from slab level. Whole panel gangs are craned in and out using the Panel lifting hook, whose forged Lifting hook body and spring Hook safety latch engage the panel lifting eyes.

Assembly and pour

A typical cycle starts by setting and clamping the first wall face on its line, fitting the corner and stop-end units, and threading the ties through the tie holes. The second face is then clamped up against it, the ties are tensioned with the wing nuts, and the walers and props bring the wall to line and plumb. Platform brackets and the ladder go on before concreting so the crew can place and vibrate from a guarded deck. Pour rate is controlled so the pressure on the panels stays within the rated 60 to 80 kN/m2. Once the concrete has gained enough strength the wing nuts are released, the wedge clamps and props are struck, and the panels are craned to the next lift, leaving only the cone recesses to patch.

Wall Formwork parts and their functions

13 top-level parts · 665 parts in total · full bill of materials below
Wall Formwork parts diagram: 1 framed wall panel, 2 inside corner panel, 3 outside corner panel, 4 stop-end panel, 5 waler alignment beam, 6 form tie assembly, 7 panel wedge clamp, 8 adjustable compensation clamp, 9 push-pull prop, 10 working platform bracket, 11 access ladder, 12 panel lifting hook, 13 fastener set. 665 parts in 13 assemblies.
Wall Formwork parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Framed wall panel 7 parts Standard 2.7 m x 0.9 m wall panel
2 Inside corner panel 4 parts Inside corner units
3 Outside corner panel 4 parts Outside corner units
4 Stop-end panel 4 parts Wall-end closure panels
5 Waler alignment beam 3 parts Horizontal alignment rails
6 Form tie assembly 6 parts 24× Through-wall form ties
7 Panel wedge clamp 4 parts 18× Wedge connectors between panels
8 Adjustable compensation clamp 3 parts Compensation clamps for non-modular gaps
9 Push-pull prop 5 parts Plumb and brace the wall
10 Working platform bracket 7 parts Working-platform support brackets
11 Access ladder 3 parts Climb to the platform
12 Panel lifting hook 3 parts Crane lifting points
13 Fastener Set Assorted bolts, pins and clips

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Wall Formwork

13 top-level lines · 66 rows shown · 665 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Framed wall panel 7 parts wf-frame-panel 8 19 assembly
1.1 Steel panel frame profile wf-steel-frame-profile 8 · part
1.2 Cross stiffening rib wf-cross-rib 32 · part
1.3 Plywood formface sheet wf-formface-ply 8 · part
1.4 Panel edge rail wf-edge-rail 32 · part
1.5 Tie-hole sleeve wf-tie-hole-sleeve 48 · part
1.6 Panel lifting eye wf-lifting-eye 16 · part
1.7 Fastener Set fastener-set 8 · part
2 Inside corner panel 4 parts wf-corner-panel-inside 2 5 assembly
2.1 Corner frame profile wf-corner-profile 2 · part
2.2 Plywood formface sheet wf-formface-ply 2 · part
2.3 Corner adjustment hinge wf-corner-hinge 4 · part
2.4 Fastener Set fastener-set 2 · part
3 Outside corner panel 4 parts wf-corner-panel-outside 2 5 assembly
3.1 Corner frame profile wf-corner-profile 2 · part
3.2 Plywood formface sheet wf-formface-ply 2 · part
3.3 Corner tie bracket wf-corner-tie-bracket 4 · part
3.4 Fastener Set fastener-set 2 · part
4 Stop-end panel 4 parts wf-stop-end-panel 2 5 assembly
4.1 Stop-end frame wf-stop-end-frame 2 · part
4.2 Plywood formface sheet wf-formface-ply 2 · part
4.3 Stop-end clamp wf-stop-end-clamp 4 · part
4.4 Fastener Set fastener-set 2 · part
5 Waler alignment beam 3 parts wf-waler-beam 6 7 assembly
5.1 Waler beam section wf-waler-section 6 · part
5.2 Waler clamp wf-waler-clamp 24 · part
5.3 Waler connecting pin wf-waler-end-pin 12 · part
6 Form tie assembly 6 parts wf-tie-assembly 24× 24 9 assembly
6.1 Tie rod wf-tie-rod 24 · part
6.2 Tie wing nut wf-wing-nut 48 · part
6.3 Tie spacer cone wf-tie-cone 48 · part
6.4 Tie sleeve tube wf-tie-sleeve 24 · part
6.5 Tie water stop wf-water-stop 24 · part
6.6 Tie counter plate wf-tie-plate 48 · part
7 Panel wedge clamp 4 parts wf-panel-clamp 18× 18 5 assembly
7.1 Clamp body wf-clamp-body 18 · part
7.2 Clamp wedge wf-clamp-wedge 18 · part
7.3 Clamp jaw wf-clamp-jaw 36 · part
7.4 Coil Spring coil-spring 18 · part
8 Adjustable compensation clamp 3 parts wf-adjustable-clamp 8 3 assembly
8.1 Clamp body wf-clamp-body 8 · part
8.2 Clamp adjustment screw wf-adjust-screw 8 · part
8.3 Filler waling wf-filler-waling 8 · part
9 Push-pull prop 5 parts wf-push-pull-prop 6 5 assembly
9.1 Prop tube wf-prop-tube 6 · part
9.2 Prop turnbuckle wf-prop-turnbuckle 6 · part
9.3 Prop panel shoe wf-prop-panel-shoe 6 · part
9.4 Prop base plate wf-prop-base-plate 6 · part
9.5 Base anchor bolt wf-base-anchor 6 · part
10 Working platform bracket 7 parts wf-platform-bracket 6 9 assembly
10.1 Bracket arm wf-bracket-arm 6 · part
10.2 Bracket panel hook wf-bracket-hook 6 · part
10.3 Platform deck board wf-platform-deck 12 · part
10.4 Guardrail post wf-guardrail-post 6 · part
10.5 Guardrail rail wf-guardrail-rail 12 · part
10.6 Toe board wf-toe-board 6 · part
10.7 Fastener Set fastener-set 6 · part
11 Access ladder 3 parts wf-access-ladder 1 14 assembly
11.1 Ladder stile wf-ladder-stile 2 · part
11.2 Ladder rung wf-ladder-rung 10× 10 · part
11.3 Ladder hook wf-ladder-hook 2 · part
12 Panel lifting hook 3 parts wf-lifting-hook 4 3 assembly
12.1 Lifting hook body wf-hook-body 4 · part
12.2 Hook safety latch wf-hook-latch 4 · part
12.3 Coil Spring coil-spring 4 · part
13 Fastener Set fastener-set 1 · part

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $15k–$2M. How estimates work
VendorHQSpecialtyMOQLead time
🇺🇸Caterpillar
caterpillar.com ↗
Irving, US Construction & mining equipment made to order 16–28 wks
🇯🇵Komatsu
komatsu.com ↗
Tokyo, JP Construction & mining equipment made to order 16–28 wks
🇸🇪Volvo CE
volvoce.com ↗
Gothenburg, SE Construction equipment made to order 16–28 wks
🇨🇭Liebherr
liebherr.com ↗
Bulle, CH Cranes & heavy equipment made to order 16–28 wks
🇨🇳XCMG
xcmg.com ↗
Xuzhou, CN Construction machinery made to order 16–28 wks