A luffing jib tower crane lifts and places loads on tall buildings where a flat-top or hammerhead crane cannot fit. Instead of a fixed horizontal jib, the Luffing Jib pivots at its foot and is raised or lowered by a rope system, so the working radius changes by changing the jib angle rather than by trolleying along the jib. The minimum radius can be brought in to a few metres by luffing the jib steep, which keeps the slewing envelope tight on a congested site and clear of neighbouring buildings and other cranes. The trade-off is capacity: load at a given radius is lower than a comparable saddle jib crane because the jib carries bending as well as the rope pull.

The crane stands on a Foundation and Base cast into a concrete block, climbs to height through a self-erection Climbing Cage, and rotates on a Slewing Unit. Above the slew bearing sit the Tower Top A-Frame, the jib, and the Counter-Jib and Counterweight that carries the machinery and ballast. The Electrical and Control System runs the three powered motions and enforces the load limits.

Foundation and base

The crane reacts very large overturning moments into the ground. The Cross Base Frame is a cruciform welded frame that spreads the moment to a cast footing. Four Foundation Anchor Set sets are embedded in the concrete pour, each holding a group of Anchor Bolt fixings located by a buried Anchor Frame. The base sits on the anchors through Fixing Angle corners, and Central Ballast Block slabs are stacked on the cross arms to hold the crane down in free-standing service. For taller configurations the mast is tied back to the structure with a Building Tie Frame.

Tower mast and climbing

The mast is built from stacked Mast Section units, each a square lattice of four Mast Corner Chord legs braced by Mast Diagonal Brace and Mast Horizontal Brace members, with a Access Ladder Segment inside for access. Sections splice together with a Mast Connecting Pin Set and seat on the base through the Mast Foot Section.

The crane raises its own height with the climbing cage. The Climbing Frame surrounds the mast and carries the whole upper works. A long-stroke Climbing Hydraulic Cylinder, fed by the Hydraulic Power Pack, jacks the cage up by one section height. A Support Pawl Set rests the cage on the mast between strokes while a new Mast Section is rolled in across the Climbing Work Platform and pinned. Repeating the cycle adds sections one at a time until the crane reaches working height.

Slewing and tower top

The upper works rotate on the Slewing Bearing Ring, a large-diameter bearing whose Slew Inner Race (Geared) carries internal teeth. Two Slew Drive Unit units, each a motor and gearbox ending in a Slew Pinion, mesh the ring and turn the Turntable Platform that carries everything above. A Slew Holding Brake holds position and damps swing. Above the turntable, the Tower Top A-Frame A-frame anchors the luffing rope through the Top Sheave Set and ties back to the counter-jib through the Pendant Anchor.

Luffing jib and luffing drive

The jib pivots on the turntable at the Jib Foot Section, which carries the Jib Foot Bearing and turns on the Jib Foot Pivot Pin. Lattice Jib Section units extend out to the Jib Head, which holds the Jib Head Load Sheave for the hoist rope. The jib angle is set by the Luffing Mechanism. A Luffing Winch spools the Luffing Wire Rope, reeved between the A-frame sheaves and the jib, so winding in raises the jib and reduces radius. The Pendant Guy Rope stays carry the back tension to the counter-jib, and every rope ends in a Rope End Socket. Because the jib can fall under its own weight, the luffing winch uses two independent Winch Service Brake sets.

Hoisting and counterweight

The Main Hoist Winch is the primary lifting machine. Its Hoist Drive Motor drives the drum through the Hoist Reduction Gearbox, and two Hoist Brake units hold the load. The Hoist Wire Rope runs over the jib head sheaves down to the Hook Block, where multiple Hook Block Sheave sheaves multiply the line pull and the Forged Load Hook carries the load on a swivel Hook Thrust Bearing closed by a Hook Safety Latch. The Counter-Jib and Counterweight behind the tower top carries the winches on its Machinery Deck and the Counterweight Block ballast that balances the moment. A luffing crane carries less counterweight than a hammerhead because raising the jib shortens the load arm and shifts the balance as the radius changes.

Control, sensing, and operation

The operator works from the Operator Cab through a Control Console of joysticks and the Operator Display Panel. Each motion has its own drive: the Hoist VFD, the Slew VFD, and the Luffing VFD, all coordinated by the PLC Controller inside the Main Control Cabinet. The Load Moment Indicator reads a Load Cell and a Jib Angle Sensor to compute load moment against the rated chart and trip the drives before an overload. The Anemometer at the jib head warns the operator as wind rises toward the in-service limit; above it, the crane is taken out of service and left to weathervane. Power crosses the rotating joint through the Slip Ring Assembly in the Power Distribution Unit unit, fed from the ground by the Festoon Trailing Cable.

Luffing Jib Tower Crane parts and their functions

12 top-level parts · 1,807 parts in total · full bill of materials below
Luffing Jib Tower Crane parts diagram: 1 foundation and base, 2 tower mast, 3 climbing cage, 4 slewing unit, 5 tower top a-frame, 6 luffing jib, 7 luffing mechanism, 8 main hoist winch, 9 counter-jib and counterweight, 10 hook block, 11 operator cab, 12 electrical and control system. 1,807 parts in 12 assemblies.
Luffing Jib Tower Crane parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Foundation and Base 5 parts Base frame and ballast
2 Tower Mast 4 parts Vertical mast
3 Climbing Cage 5 parts Self-erection climbing frame
4 Slewing Unit 4 parts Rotation at tower top
5 Tower Top A-Frame 4 parts A-frame above slew ring
6 Luffing Jib 5 parts Raisable boom
7 Luffing Mechanism 4 parts Jib angle drive
8 Main Hoist Winch 5 parts Main load hoist
9 Counter-Jib and Counterweight 4 parts Rear jib with counterweight
10 Hook Block 5 parts Load attachment
11 Operator Cab 5 parts Operator station
12 Electrical and Control System 8 parts Drives and control

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Luffing Jib Tower Crane

12 top-level lines · 173 rows shown · 1,807 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Foundation and Base 5 parts luffing-jib-crane-foundation 1 38 assembly
1.1 Cross Base Frame luffing-jib-crane-cross-base 1 · part
1.2 Foundation Anchor Set 3 parts luffing-jib-crane-foundation-anchor 4 6 assembly
1.2.1 Anchor Bolt luffing-jib-crane-anchor-bolt 16 · part
1.2.2 Anchor Frame luffing-jib-crane-anchor-frame 4 · part
1.2.3 Fastener Set fastener-set 4 · part
1.3 Fixing Angle luffing-jib-crane-fixing-angle 4 · part
1.4 Central Ballast Block luffing-jib-crane-ballast-block 8 · part
1.5 Fastener Set fastener-set 1 · part
2 Tower Mast 4 parts luffing-jib-crane-tower-mast 1 258 assembly
2.1 Mast Section 4 parts luffing-jib-crane-mast-section 14× 14 17 assembly
2.1.1 Mast Corner Chord luffing-jib-crane-mast-chord 56 · part
2.1.2 Mast Diagonal Brace luffing-jib-crane-mast-diagonal 112 · part
2.1.3 Mast Horizontal Brace luffing-jib-crane-mast-horizontal 56 · part
2.1.4 Access Ladder Segment luffing-jib-crane-ladder-segment 14 · part
2.2 Mast Foot Section luffing-jib-crane-mast-foot-section 1 · part
2.3 Mast Connecting Pin Set luffing-jib-crane-mast-pin-set 13× 13 · part
2.4 Building Tie Frame 3 parts luffing-jib-crane-tie-frame 1 6 assembly
2.4.1 Tie Collar luffing-jib-crane-tie-collar 1 · part
2.4.2 Tie Strut luffing-jib-crane-tie-strut 4 · part
2.4.3 Fastener Set fastener-set 1 · part
3 Climbing Cage 5 parts luffing-jib-crane-climbing-cage 1 42 assembly
3.1 Climbing Frame luffing-jib-crane-climbing-frame 1 · part
3.2 Climbing Hydraulic Cylinder 4 parts luffing-jib-crane-climbing-cylinder 1 6 assembly
3.2.1 Cylinder Tube luffing-jib-crane-cylinder-tube 1 · part
3.2.2 Cylinder Piston Rod luffing-jib-crane-piston-rod 1 · part
3.2.3 O-Ring Set oring-set 2 · part
3.2.4 Oil Seal oil-seal 2 · part
3.3 Hydraulic Power Pack 5 parts luffing-jib-crane-hydraulic-power-pack 1 29 assembly
3.3.1 Hydraulic Gear Pump luffing-jib-crane-hydraulic-pump 1 · part
3.3.2 Pump Drive Motor 3 parts + deeper › luffing-jib-crane-hydraulic-motor 1 24 assembly
3.3.3 Hydraulic Valve Block luffing-jib-crane-control-valve-block 1 · part
3.3.4 Hydraulic Oil Reservoir luffing-jib-crane-oil-reservoir 1 · part
3.3.5 Pressure Sensor pressure-sensor 2 · part
3.4 Climbing Work Platform luffing-jib-crane-climbing-platform 2 · part
3.5 Support Pawl Set luffing-jib-crane-pawl-set 4 · part
4 Slewing Unit 4 parts luffing-jib-crane-slewing-unit 1 196 assembly
4.1 Slewing Bearing Ring 4 parts luffing-jib-crane-slew-ring 1 124 assembly
4.1.1 Slew Inner Race (Geared) luffing-jib-crane-slew-inner-race 1 · part
4.1.2 Slew Outer Race luffing-jib-crane-slew-outer-race 1 · part
4.1.3 Ball Bearing ball-bearing 120× 120 · part
4.1.4 Oil Seal oil-seal 2 · part
4.2 Slew Drive Unit 7 parts luffing-jib-crane-slew-drive 2 35 assembly
4.2.1 Slew Drive Motor 3 parts + deeper › luffing-jib-crane-slew-motor 2 24 assembly
4.2.2 Gearbox Housing gearbox-housing 2 · part
4.2.3 Helical Gear Pair gear-pair 4 · part
4.2.4 Slew Pinion luffing-jib-crane-slew-pinion 2 · part
4.2.5 Slew Holding Brake luffing-jib-crane-slew-brake 2 · part
4.2.6 Ball Bearing ball-bearing 8 · part
4.2.7 Oil Seal oil-seal 4 · part
4.3 Turntable Platform luffing-jib-crane-turntable 1 · part
4.4 Fastener Set fastener-set 1 · part
5 Tower Top A-Frame 4 parts luffing-jib-crane-tower-top 1 23 assembly
5.1 A-Frame Structure luffing-jib-crane-a-frame 1 · part
5.2 Top Sheave Set 3 parts luffing-jib-crane-top-sheave-set 1 19 assembly
5.2.1 Rope Sheave luffing-jib-crane-sheave 6 · part
5.2.2 Sheave Shaft luffing-jib-crane-sheave-shaft 1 · part
5.2.3 Ball Bearing ball-bearing 12× 12 · part
5.3 Pendant Anchor luffing-jib-crane-pendant-anchor 2 · part
5.4 Fastener Set fastener-set 1 · part
6 Luffing Jib 5 parts luffing-jib-crane-luffing-jib 1 135 assembly
6.1 Jib Foot Section 3 parts luffing-jib-crane-jib-foot-section 1 14 assembly
6.1.1 Jib Corner Chord luffing-jib-crane-jib-chord 4 · part
6.1.2 Jib Diagonal Brace luffing-jib-crane-jib-diagonal 8 · part
6.1.3 Jib Foot Bearing luffing-jib-crane-foot-bearing 2 · part
6.2 Jib Section 3 parts luffing-jib-crane-jib-section 6 16 assembly
6.2.1 Jib Corner Chord luffing-jib-crane-jib-chord 24 · part
6.2.2 Jib Diagonal Brace luffing-jib-crane-jib-diagonal 48 · part
6.2.3 Jib Horizontal Brace luffing-jib-crane-jib-horizontal 24 · part
6.3 Jib Head 4 parts luffing-jib-crane-jib-head 1 17 assembly
6.3.1 Jib Head Load Sheave luffing-jib-crane-head-sheave 4 · part
6.3.2 Sheave Shaft luffing-jib-crane-sheave-shaft 1 · part
6.3.3 Ball Bearing ball-bearing 8 · part
6.3.4 Jib Corner Chord luffing-jib-crane-jib-chord 4 · part
6.4 Jib Foot Pivot Pin luffing-jib-crane-jib-foot-pin 2 · part
6.5 Jib Section Pin Set luffing-jib-crane-jib-pin-set 6 · part
7 Luffing Mechanism 4 parts luffing-jib-crane-luffing-mechanism 1 44 assembly
7.1 Luffing Winch 7 parts luffing-jib-crane-luffing-winch 1 37 assembly
7.1.1 Luffing Winch Drum luffing-jib-crane-winch-drum 1 · part
7.1.2 Luffing Drive Motor 3 parts + deeper › luffing-jib-crane-winch-motor 1 24 assembly
7.1.3 Gearbox Housing gearbox-housing 1 · part
7.1.4 Helical Gear Pair gear-pair 3 · part
7.1.5 Winch Service Brake luffing-jib-crane-winch-brake 2 · part
7.1.6 Ball Bearing ball-bearing 4 · part
7.1.7 Oil Seal oil-seal 2 · part
7.2 Luffing Wire Rope luffing-jib-crane-luffing-rope 1 · part
7.3 Pendant Guy Rope luffing-jib-crane-pendant-rope 2 · part
7.4 Rope End Socket luffing-jib-crane-rope-socket 4 · part
8 Main Hoist Winch 5 parts luffing-jib-crane-hoist-winch 1 41 assembly
8.1 Hoist Winch Drum luffing-jib-crane-hoist-drum 1 · part
8.2 Hoist Drive Motor 3 parts luffing-jib-crane-hoist-motor 1 24 assembly
8.2.1 Stator Assembly 3 parts + deeper › stator-assembly 1 3 assembly
8.2.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1 19 assembly
8.2.3 Ball Bearing ball-bearing 2 · part
8.3 Hoist Reduction Gearbox 4 parts luffing-jib-crane-hoist-gearbox 1 13 assembly
8.3.1 Gearbox Housing gearbox-housing 1 · part
8.3.2 Helical Gear Pair gear-pair 3 · part
8.3.3 Ball Bearing ball-bearing 6 · part
8.3.4 Oil Seal oil-seal 3 · part
8.4 Hoist Brake luffing-jib-crane-hoist-brake 2 · part
8.5 Hoist Wire Rope luffing-jib-crane-hoist-rope 1 · part
9 Counter-Jib and Counterweight 4 parts luffing-jib-crane-counter-jib 1 9 assembly
9.1 Counter-Jib Frame luffing-jib-crane-counter-jib-frame 1 · part
9.2 Counterweight Block luffing-jib-crane-counterweight-block 6 · part
9.3 Machinery Deck luffing-jib-crane-machinery-deck 1 · part
9.4 Fastener Set fastener-set 1 · part
10 Hook Block 5 parts luffing-jib-crane-hook-block 1 15 assembly
10.1 Hook Block Sheave luffing-jib-crane-block-sheave 4 · part
10.2 Forged Load Hook luffing-jib-crane-load-hook 1 · part
10.3 Hook Thrust Bearing luffing-jib-crane-hook-bearing 1 · part
10.4 Hook Safety Latch luffing-jib-crane-safety-latch 1 · part
10.5 Ball Bearing ball-bearing 8 · part
11 Operator Cab 5 parts luffing-jib-crane-operator-cab 1 174 assembly
11.1 Cab Shell 3 parts luffing-jib-crane-cab-shell 1 11 assembly
11.1.1 Sheet Metal Panel sheet-panel 6 · part
11.1.2 Cab Glazing Panel luffing-jib-crane-cab-glazing 4 · part
11.1.3 Fastener Set fastener-set 1 · part
11.2 Operator Seat luffing-jib-crane-operator-seat 1 · part
11.3 Control Console 5 parts luffing-jib-crane-control-console 1 76 assembly
11.3.1 Control Joystick luffing-jib-crane-joystick 2 · part
11.3.2 Bare PCB pcb-bare 1 · part
11.3.3 Microcontroller mcu 1 · part
11.3.4 SMD Passive (R/C/L) smd-passives 60× 60 · part
11.3.5 Connector connector 12× 12 · part
11.4 Operator Display Panel 4 parts luffing-jib-crane-display-panel 1 83 assembly
11.4.1 LCD Panel lcd-panel 1 · part
11.4.2 Bare PCB pcb-bare 1 · part
11.4.3 Microcontroller mcu 1 · part
11.4.4 SMD Passive (R/C/L) smd-passives 80× 80 · part
11.5 Cab Climate Unit 3 parts luffing-jib-crane-cab-hvac 1 3 assembly
11.5.1 Heating Element heating-element 1 · part
11.5.2 Cab Blower Motor luffing-jib-crane-cab-blower 1 · part
11.5.3 Drive Belt drive-belt 1 · part
12 Electrical and Control System 8 parts luffing-jib-crane-electrical-system 1 832 assembly
12.1 Main Control Cabinet 6 parts luffing-jib-crane-control-panel 1 322 assembly
12.1.1 PLC Controller 4 parts + deeper › luffing-jib-crane-plc-module 1 223 assembly
12.1.2 Relay relay 24× 24 · part
12.1.3 Power Contactor luffing-jib-crane-contactor 12× 12 · part
12.1.4 Power Supply power-supply 2 · part
12.1.5 Wire Bundle wire-bundle 1 · part
12.1.6 Connector connector 60× 60 · part
12.2 Hoist VFD 5 parts luffing-jib-crane-vfd-hoist 1 157 assembly
12.2.1 Bare PCB pcb-bare 1 · part
12.2.2 IGBT Power Stack luffing-jib-crane-igbt-stack 1 · part
12.2.3 Microcontroller mcu 1 · part
12.2.4 SMD Passive (R/C/L) smd-passives 150× 150 · part
12.2.5 DC Bus Capacitor luffing-jib-crane-dc-bus-cap 4 · part
12.3 Slew VFD 5 parts luffing-jib-crane-vfd-slew 1 126 assembly
12.3.1 Bare PCB pcb-bare 1 · part
12.3.2 IGBT Power Stack luffing-jib-crane-igbt-stack 1 · part
12.3.3 Microcontroller mcu 1 · part
12.3.4 SMD Passive (R/C/L) smd-passives 120× 120 · part
12.3.5 DC Bus Capacitor luffing-jib-crane-dc-bus-cap 3 · part
12.4 Luffing VFD 5 parts luffing-jib-crane-vfd-luff 1 126 assembly
12.4.1 Bare PCB pcb-bare 1 · part
12.4.2 IGBT Power Stack luffing-jib-crane-igbt-stack 1 · part
12.4.3 Microcontroller mcu 1 · part
12.4.4 SMD Passive (R/C/L) smd-passives 120× 120 · part
12.4.5 DC Bus Capacitor luffing-jib-crane-dc-bus-cap 3 · part
12.5 Load Moment Indicator 6 parts luffing-jib-crane-lmi-unit 1 95 assembly
12.5.1 Bare PCB pcb-bare 1 · part
12.5.2 Microcontroller mcu 1 · part
12.5.3 Pressure Sensor pressure-sensor 1 · part
12.5.4 Load Cell luffing-jib-crane-load-cell 1 · part
12.5.5 Jib Angle Sensor luffing-jib-crane-angle-sensor 1 · part
12.5.6 SMD Passive (R/C/L) smd-passives 90× 90 · part
12.6 Anemometer luffing-jib-crane-anemometer 1 · part
12.7 Power Distribution Unit 4 parts luffing-jib-crane-power-distribution 1 4 assembly
12.7.1 Main Circuit Breaker luffing-jib-crane-main-breaker 1 · part
12.7.2 Slip Ring Assembly luffing-jib-crane-slip-ring 1 · part
12.7.3 Control Transformer luffing-jib-crane-transformer 1 · part
12.7.4 Wire Bundle wire-bundle 1 · part
12.8 Festoon Trailing Cable luffing-jib-crane-festoon-cable 1 · part

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $15k–$2M. How estimates work
VendorHQSpecialtyMOQLead time
🇺🇸Caterpillar
caterpillar.com ↗
Irving, US Construction & mining equipment made to order 16–28 wks
🇯🇵Komatsu
komatsu.com ↗
Tokyo, JP Construction & mining equipment made to order 16–28 wks
🇸🇪Volvo CE
volvoce.com ↗
Gothenburg, SE Construction equipment made to order 16–28 wks
🇨🇭Liebherr
liebherr.com ↗
Bulle, CH Cranes & heavy equipment made to order 16–28 wks
🇨🇳XCMG
xcmg.com ↗
Xuzhou, CN Construction machinery made to order 16–28 wks

1,089-word article