Vibratory Truss Screed Product
Overview
A vibratory truss screed strikes off and consolidates fresh concrete on wide flatwork — bridge decks, floor slabs, canal linings, and large pours where a hand screed or roller screed cannot span the width. A long aluminum truss bridges the full width of the pour between set side forms or screed rails. As the truss is hauled along, its vibrating bottom edge cuts the concrete to grade and drives the slurry up to fill voids, leaving a flat, consolidated surface ready for finishing.
The structure is a Truss Frame built from bolt-together Truss Section bays, so the same machine sets to any span the job needs. Each end rests on a wheeled End Carriage that rides the form, and operators steady the truss with a Operator Handle at each end.
How it works
Consolidation comes from the Vibration Drive. A Vibration Motor spins a long Eccentric Shaft running the length of the truss; the offset weight throws a rotating force that shakes the whole frame thousands of times a minute. That vibration passes into the Strike-Off Blade along the truss bottom, which liquefies the surface paste so the truss can shear off the excess and the concrete settles dense and flat.
The screed advances itself rather than being dragged by hand. A Self-Propel Winch anchors its cable ahead of the pour and winds in, hauling the whole truss forward along the forms at a slow, even rate set by the operator. Final slab grade is dialed in at each End Carriage using a Grade Adjuster, a screw that raises or lowers the blade relative to the form.
Both motors run from a sealed Control Box box, where a Speed Controller tunes vibration intensity and winch speed independently so the operator can match the screed to slump, span, and pour rate.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labourTap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
9 top-level lines · 44 rows shown · 128 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Truss Frame 3 parts | screed-machine-truss | 1× | 1 | 9 | assembly |
| 1.1 | Truss Section | screed-machine-truss-section | 4× | 4 | — | part |
| 1.2 | Splice Plate | screed-machine-truss-splice | 3× | 3 | — | part |
| 1.3 | End Frame | screed-machine-end-frame | 2× | 2 | — | part |
| 2 | Vibration Drive 5 parts | screed-machine-vibrator | 1× | 1 | 35 | assembly |
| 2.1 | Vibration Motor 5 parts | screed-machine-vib-motor | 1× | 1 | 26 | assembly |
| 2.1.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 2.1.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 2.1.3 | Copper Winding | copper-winding | 1× | 1 | — | part |
| 2.1.4 | Motor Housing | motor-housing | 1× | 1 | — | part |
| 2.1.5 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 2.2 | Eccentric Shaft | screed-machine-eccentric-shaft | 1× | 1 | — | part |
| 2.3 | Shaft Coupling | screed-machine-shaft-coupling | 2× | 2 | — | part |
| 2.4 | Ball Bearing | ball-bearing | 4× | 4 | — | part |
| 2.5 | Oil Seal | oil-seal | 2× | 2 | — | part |
| 3 | Self-Propel Winch 5 parts | screed-machine-winch | 1× | 1 | 31 | assembly |
| 3.1 | Winch Motor 5 parts | screed-machine-winch-motor | 1× | 1 | 26 | assembly |
| 3.1.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 3.1.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 3.1.3 | Copper Winding | copper-winding | 1× | 1 | — | part |
| 3.1.4 | Motor Housing | motor-housing | 1× | 1 | — | part |
| 3.1.5 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 3.2 | Cable Drum | screed-machine-winch-drum | 1× | 1 | — | part |
| 3.3 | Haul Cable | screed-machine-cable | 1× | 1 | — | part |
| 3.4 | Helical Gear Pair | gear-pair | 1× | 1 | — | part |
| 3.5 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 4 | End Carriage 3 parts | screed-machine-carriage | 2× | 2 | 20 | assembly |
| 4.1 | Carriage Frame | screed-machine-carriage-frame | 1× | 2 | — | part |
| 4.2 | Wheel Assembly 5 parts | wheel-assembly | 2× | 4 | 9 | assembly |
| 4.2.1 | Alloy Wheel | alloy-wheel | 1× | 4 | — | part |
| 4.2.2 | Tire | tire | 1× | 4 | — | part |
| 4.2.3 | TPMS Sensor | tpms-sensor | 1× | 4 | — | part |
| 4.2.4 | Lug Nut | lug-nut | 5× | 20 | — | part |
| 4.2.5 | Valve Stem | valve-stem | 1× | 4 | — | part |
| 4.3 | Grade Adjuster | screed-machine-grade-adjuster | 1× | 2 | — | part |
| 5 | Strike-Off Blade | screed-machine-blade | 1× | 1 | — | part |
| 6 | Control Box 4 parts | screed-machine-controls | 1× | 1 | 8 | assembly |
| 6.1 | Bare PCB | pcb-bare | 1× | 1 | — | part |
| 6.2 | Speed Controller | screed-machine-vfd | 1× | 1 | — | part |
| 6.3 | Relay | relay | 2× | 2 | — | part |
| 6.4 | Connector | connector | 4× | 4 | — | part |
| 7 | Operator Handle | screed-machine-handles | 2× | 2 | — | part |
| 8 | Wire Bundle | wire-bundle | 1× | 1 | — | part |
| 9 | Fastener Set | fastener-set | 1× | 1 | — | part |
Sourcing — likely vendors
Companies that make this · indicative price $15k–$2M · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| caterpillar.com ↗ | Irving, US | Construction & mining equipment | made to order | 16–28 wks |
| 🇯🇵Komatsu komatsu.com ↗ | Tokyo, JP | Construction & mining equipment | made to order | 16–28 wks |
| 🇸🇪Volvo CE volvoce.com ↗ | Gothenburg, SE | Construction equipment | made to order | 16–28 wks |
| 🇨🇭Liebherr liebherr.com ↗ | Bulle, CH | Cranes & heavy equipment | made to order | 16–28 wks |
| 🇨🇳XCMG xcmg.com ↗ | Xuzhou, CN | Construction machinery | made to order | 16–28 wks |
318-word article