Stiffleg Derrick Crane

Product

Overview

A stiffleg derrick is a fixed lifting machine built around a vertical Vertical Mast held upright by two rigid struts, the Stiffleg Strut members, set at roughly a right angle to each other. A hinged Lattice Boom pivots at the base of the mast and is raised or lowered by a topping rope. The whole assembly of mast and boom turns as one unit on a pivot at the mast foot, so a load picked up at one bearing can be slewed across an arc and set down somewhere else.

The defining feature is the pair of stifflegs. An older guy derrick uses several wire guy ropes anchored to the ground to keep its mast vertical. A stiffleg derrick replaces those ropes with two stiff compression members, the Stiffleg Tube struts, that run from the Mast Cap & Spider down to the ends of two horizontal Sill Beam members on the ground. The sills meet at a corner under the Mast Foot Socket, so the base forms an L. Because the struts are rigid, the crane needs no surrounding anchor field and can sit on a roof, a floor slab, or a quarry bench where there is no room to run guys.

Base and foundation

The Base & Sill Foundation carries every load down to the ground. Two heavy Sill Beam members lie at about 90 deg, bolted at their meeting corner to the Mast Foot Socket. Each sill spreads its load through a Sole Plate onto a concrete pad, and the outer ends are weighed down by Ballast Block kentledge and held by cast-in Foundation Anchor Bolt sets. When the boom lifts a load, the mast tries to overturn toward that load. One stiffleg goes into compression and pushes its sill end down, while the opposite sill end is held by ballast and anchor bolts against uplift. The right-angle layout means that wherever the boom points within the working arc, at least one of the two sills resists the overturning moment.

Mast and stifflegs

The Vertical Mast is a lattice column of stacked Mast Lattice Section modules, each built from four Mast Chord Angle corners braced by Lacing Bar diagonals. At the top, the Spider Casting gathers the stiffleg heads and the luffing bridle on hardened pins. At the bottom, the Mast Foot Pivot turns inside the foot socket on a Footstep Thrust Bearing thrust bearing that takes the full vertical weight. The two Stiffleg Strut struts run from the spider down to the sill ends, each ending in a Stiffleg Foot Casting casting pinned to the beam and a Stiffleg Head Casting casting pinned to the mast cap. The struts are sized for compression buckling rather than tension, which is why they are large tubes rather than ropes.

Why slew is limited to about 270 degrees

The two stifflegs occupy a quadrant of the circle around the mast. The boom can swing freely through the open part of the circle, but it cannot pass through the space taken by a strut, so a stiffleg derrick reaches a working arc of roughly 270 deg rather than a full turn. A tower crane or a guy derrick can slew the full 360 deg because nothing stands in the boom path; the stiffleg pays for its rigid, anchor-free base with that lost quadrant. A Slew Limit Cam trips a switch and stops rotation before the boom can foul a strut. Site layout therefore matters: the corner formed by the stifflegs is pointed away from the main lifting zone so the usable arc covers the work.

Boom and luffing

The Lattice Boom is a lattice jib whose length is set by the number of Boom Insert Section inserts between the Boom Butt Section and the Boom Head. It hinges on the Boom Foot Pivot at the mast base and is held up by the topping rope. Raising the boom shortens the radius and increases the safe load; lowering it reaches farther for a lighter load. The Luffing Winch pays its Topping Rope over the Bridle Block at the mast top and down to the boom head. A Boom Stay Pendant pendant steadies the boom against side sway. The luffing winch carries a Band Brake so the boom holds position with the motor off.

Hoist and slew drives

The Main Hoist System does the lifting. The Main Hoist Winch spools its Hoist Rope over the Load Sheave groups at the boom head and the Hook Block, so the line is reeved several falls to multiply capacity. The block ends in a forged Load Hook on a Hook Swivel Bearing so the load can turn without twisting the rope. A Hoist Disc Brake holds the drum when the load is suspended. The Slewing System turns the crane: a Slew Pinion driven by the Slew Drive Unit meshes with the Slew Bull Wheel ring at the mast foot, and a Slew Brake holds the crane against wind and load swing. Each motion runs through a Winch Drive Motor with its own holding brake.

Power, control, and use

Power comes either from electric drives fed through the Electrical System cabinet and a set of Variable Frequency Drive inverters, or from a Diesel Engine turning the Hydraulic Pump in the Power & Drive Pack pack. A Slip Ring Assembly carries power and signals across the slewing joint. The operator works from the Operator Cab, using the Control Joystick levers on the Control Console. A Crane PLC sequences the drives and enforces the Motion Limit Switch interlocks, and a Load Moment Indicator warns when the load and radius approach the rated limit. In steel erection the derrick sits on a finished floor and hoists beams and columns up to the next level, raising itself as the frame climbs. In quarries it is mounted on a bench to lift cut blocks of stone onto trucks, where its fixed base and high capacity at short radius suit the repetitive work.

Stiffleg Derrick Crane parts and their functions

10 top-level parts · 1,034 parts in total · full bill of materials below
Stiffleg Derrick Crane parts diagram: 1 base & sill foundation, 2 vertical mast, 3 stiffleg strut, 4 lattice boom, 5 luffing system, 6 main hoist system, 7 slewing system, 8 power & drive pack, 9 operator station, 10 electrical system. 1,034 parts in 10 assemblies.
Stiffleg Derrick Crane parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base & Sill Foundation 6 parts Right-angle sill base
2 Vertical Mast 5 parts Upright lattice column held vertical by the two stifflegs, carrying boom and hoist loads to the foot socket.
3 Stiffleg Strut 5 parts Two rigid struts ~90 deg apart
4 Lattice Boom 5 parts Hinged lattice jib pivoting at the mast foot and luffed by the topping rope.
5 Luffing System 4 parts Derricking the boom
6 Main Hoist System 3 parts Main load hoist
7 Slewing System 4 parts Rotates mast and boom as a unit
8 Power & Drive Pack 5 parts Prime mover and hydraulics powering the winches and slew on a diesel-driven derrick.
9 Operator Station 5 parts Cab and control system from which the operator runs hoist, luff, and slew.
10 Electrical System 6 parts Power distribution, drives, and wiring for the crane.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Stiffleg Derrick Crane

10 top-level lines · 157 rows shown · 1,034 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base & Sill Foundation 6 parts derrick-crane-base-foundation 1 30 assembly
1.1 Sill Beam derrick-crane-sill-beam 2 · part
1.2 Sole Plate derrick-crane-sole-plate 2 · part
1.3 Ballast Block derrick-crane-ballast-block 4 · part
1.4 Foundation Anchor Bolt derrick-crane-anchor-bolt 16× 16 · part
1.5 Mast Foot Socket 4 parts derrick-crane-mast-foot-socket 1 5 assembly
1.5.1 Socket Casting derrick-crane-socket-casting 1 · part
1.5.2 Footstep Thrust Bearing derrick-crane-footstep-bearing 1 · part
1.5.3 Ball Bearing ball-bearing 2 · part
1.5.4 O-Ring Set oring-set 1 · part
1.6 Fastener Set fastener-set 1 · part
2 Vertical Mast 5 parts derrick-crane-mast 1 104 assembly
2.1 Mast Lattice Section 3 parts derrick-crane-mast-section 3 29 assembly
2.1.1 Mast Chord Angle derrick-crane-chord-angle 12 · part
2.1.2 Lacing Bar derrick-crane-lacing-bar 24× 72 · part
2.1.3 Fastener Set fastener-set 3 · part
2.2 Mast Cap & Spider 4 parts derrick-crane-mast-cap 1 8 assembly
2.2.1 Spider Casting derrick-crane-spider-casting 1 · part
2.2.2 Bridle Sheave derrick-crane-bridle-sheave 2 · part
2.2.3 Ball Bearing ball-bearing 4 · part
2.2.4 Connection Pin Set derrick-crane-pin-set 1 · part
2.3 Mast Foot Pivot 4 parts derrick-crane-mast-foot-pivot 1 6 assembly
2.3.1 Pivot Journal derrick-crane-pivot-journal 1 · part
2.3.2 Ball Bearing ball-bearing 2 · part
2.3.3 Oil Seal oil-seal 2 · part
2.3.4 Slew Bull Wheel derrick-crane-slew-bullwheel 1 · part
2.4 Mast Collar derrick-crane-mast-collar 2 · part
2.5 Fastener Set fastener-set 1 · part
3 Stiffleg Strut 5 parts derrick-crane-stiffleg 2 5 assembly
3.1 Stiffleg Tube derrick-crane-stiffleg-tube 2 · part
3.2 Stiffleg Foot Casting derrick-crane-stiffleg-foot 2 · part
3.3 Stiffleg Head Casting derrick-crane-stiffleg-head 2 · part
3.4 Connection Pin Set derrick-crane-pin-set 2 · part
3.5 Fastener Set fastener-set 2 · part
4 Lattice Boom 5 parts derrick-crane-boom 1 111 assembly
4.1 Boom Butt Section 3 parts derrick-crane-boom-butt 1 25 assembly
4.1.1 Mast Chord Angle derrick-crane-chord-angle 4 · part
4.1.2 Lacing Bar derrick-crane-lacing-bar 20× 20 · part
4.1.3 Fastener Set fastener-set 1 · part
4.2 Boom Insert Section 3 parts derrick-crane-boom-section 2 33 assembly
4.2.1 Mast Chord Angle derrick-crane-chord-angle 8 · part
4.2.2 Lacing Bar derrick-crane-lacing-bar 28× 56 · part
4.2.3 Fastener Set fastener-set 2 · part
4.3 Boom Head 4 parts derrick-crane-boom-head 1 12 assembly
4.3.1 Load Sheave derrick-crane-load-sheave 3 · part
4.3.2 Sheave Axle Pin derrick-crane-sheave-pin 1 · part
4.3.3 Ball Bearing ball-bearing 6 · part
4.3.4 Rope Guard derrick-crane-rope-guard 2 · part
4.4 Boom Foot Pivot 4 parts derrick-crane-boom-foot-pivot 1 7 assembly
4.4.1 Boom Foot Pin derrick-crane-boom-foot-pin 1 · part
4.4.2 Ball Bearing ball-bearing 2 · part
4.4.3 Oil Seal oil-seal 2 · part
4.4.4 Pivot Bracket derrick-crane-pivot-bracket 2 · part
4.5 Fastener Set fastener-set 1 · part
5 Luffing System 4 parts derrick-crane-luffing-system 1 49 assembly
5.1 Luffing Winch 7 parts derrick-crane-luffing-winch 1 36 assembly
5.1.1 Winch Drum derrick-crane-winch-drum 1 · part
5.1.2 Gearbox Housing gearbox-housing 1 · part
5.1.3 Helical Gear Pair gear-pair 2 · part
5.1.4 Band Brake derrick-crane-band-brake 1 · part
5.1.5 Winch Drive Motor 4 parts + deeper › derrick-crane-drive-motor 1 25 assembly
5.1.6 Ball Bearing ball-bearing 4 · part
5.1.7 Oil Seal oil-seal 2 · part
5.2 Topping Rope derrick-crane-topping-rope 1 · part
5.3 Bridle Block 4 parts derrick-crane-bridle-block 1 11 assembly
5.3.1 Bridle Sheave derrick-crane-bridle-sheave 3 · part
5.3.2 Sheave Axle Pin derrick-crane-sheave-pin 1 · part
5.3.3 Ball Bearing ball-bearing 6 · part
5.3.4 Block Shell derrick-crane-block-shell 1 · part
5.4 Boom Stay Pendant derrick-crane-boom-stay 1 · part
6 Main Hoist System 3 parts derrick-crane-hoist-system 1 50 assembly
6.1 Main Hoist Winch 7 parts derrick-crane-hoist-winch 1 37 assembly
6.1.1 Winch Drum derrick-crane-winch-drum 1 · part
6.1.2 Gearbox Housing gearbox-housing 1 · part
6.1.3 Helical Gear Pair gear-pair 3 · part
6.1.4 Hoist Disc Brake derrick-crane-disc-brake 1 · part
6.1.5 Winch Drive Motor 4 parts + deeper › derrick-crane-drive-motor 1 25 assembly
6.1.6 Ball Bearing ball-bearing 4 · part
6.1.7 Oil Seal oil-seal 2 · part
6.2 Hoist Rope derrick-crane-hoist-rope 1 · part
6.3 Hook Block 5 parts derrick-crane-hook-block 1 12 assembly
6.3.1 Load Sheave derrick-crane-load-sheave 3 · part
6.3.2 Load Hook derrick-crane-load-hook 1 · part
6.3.3 Hook Swivel Bearing derrick-crane-swivel-bearing 1 · part
6.3.4 Block Shell derrick-crane-block-shell 1 · part
6.3.5 Ball Bearing ball-bearing 6 · part
7 Slewing System 4 parts derrick-crane-slewing-system 1 39 assembly
7.1 Slew Drive Unit 6 parts derrick-crane-slew-drive 1 36 assembly
7.1.1 Winch Drive Motor 4 parts + deeper › derrick-crane-drive-motor 1 25 assembly
7.1.2 Gearbox Housing gearbox-housing 1 · part
7.1.3 Helical Gear Pair gear-pair 3 · part
7.1.4 Slew Pinion derrick-crane-slew-pinion 1 · part
7.1.5 Ball Bearing ball-bearing 4 · part
7.1.6 Oil Seal oil-seal 2 · part
7.2 Slew Bull Wheel derrick-crane-slew-bullwheel 1 · part
7.3 Slew Brake derrick-crane-slew-brake 1 · part
7.4 Slew Limit Cam derrick-crane-slew-limit-cam 1 · part
8 Power & Drive Pack 5 parts derrick-crane-power-drive 1 33 assembly
8.1 Diesel Engine 6 parts derrick-crane-diesel-engine 1 16 assembly
8.1.1 Engine Block derrick-crane-engine-block 1 · part
8.1.2 Piston & Ring Set derrick-crane-piston-set 4 · part
8.1.3 Crankshaft derrick-crane-crankshaft 1 · part
8.1.4 Fuel Injector derrick-crane-fuel-injector 4 · part
8.1.5 Oil Seal oil-seal 4 · part
8.1.6 Ball Bearing ball-bearing 2 · part
8.2 Hydraulic Pump 5 parts derrick-crane-hydraulic-pump 1 7 assembly
8.2.1 Pump Housing derrick-crane-pump-housing 1 · part
8.2.2 Helical Gear Pair gear-pair 1 · part
8.2.3 O-Ring Set oring-set 1 · part
8.2.4 Oil Seal oil-seal 2 · part
8.2.5 Ball Bearing ball-bearing 2 · part
8.3 Hydraulic Tank derrick-crane-hydraulic-tank 1 · part
8.4 Hydraulic Control Valve 4 parts derrick-crane-control-valve 1 8 assembly
8.4.1 Valve Block derrick-crane-valve-block 1 · part
8.4.2 Valve Spool derrick-crane-spool 4 · part
8.4.3 O-Ring Set oring-set 1 · part
8.4.4 Pressure Sensor pressure-sensor 2 · part
8.5 Oil Cooler derrick-crane-cooler 1 · part
9 Operator Station 5 parts derrick-crane-control-station 1 245 assembly
9.1 Operator Cab 4 parts derrick-crane-cab 1 12 assembly
9.1.1 Sheet Metal Panel sheet-panel 6 · part
9.1.2 Cab Glazing derrick-crane-cab-glazing 4 · part
9.1.3 Operator Seat derrick-crane-operator-seat 1 · part
9.1.4 Fastener Set fastener-set 1 · part
9.2 Control Console 4 parts derrick-crane-control-console 1 17 assembly
9.2.1 Control Joystick derrick-crane-joystick 2 · part
9.2.2 Foot Pedal derrick-crane-foot-pedal 2 · part
9.2.3 Connector connector 12× 12 · part
9.2.4 Wire Bundle wire-bundle 1 · part
9.3 Crane PLC 5 parts derrick-crane-plc 1 147 assembly
9.3.1 Bare PCB pcb-bare 1 · part
9.3.2 Microcontroller mcu 2 · part
9.3.3 Relay relay 8 · part
9.3.4 SMD Passive (R/C/L) smd-passives 120× 120 · part
9.3.5 Connector connector 16× 16 · part
9.4 Load Moment Indicator 5 parts derrick-crane-load-indicator 1 65 assembly
9.4.1 Bare PCB pcb-bare 1 · part
9.4.2 Microcontroller mcu 1 · part
9.4.3 LCD Panel lcd-panel 1 · part
9.4.4 Pressure Sensor pressure-sensor 2 · part
9.4.5 SMD Passive (R/C/L) smd-passives 60× 60 · part
9.5 Motion Limit Switch derrick-crane-limit-switch 4 · part
10 Electrical System 6 parts derrick-crane-electrical 1 363 assembly
10.1 Switchgear Cabinet 4 parts derrick-crane-switchgear 1 35 assembly
10.1.1 Sheet Metal Panel sheet-panel 4 · part
10.1.2 Relay relay 10× 10 · part
10.1.3 Connector connector 20× 20 · part
10.1.4 Fastener Set fastener-set 1 · part
10.2 Power Supply power-supply 1 · part
10.3 Variable Frequency Drive 4 parts derrick-crane-vfd 3 98 assembly
10.3.1 Bare PCB pcb-bare 3 · part
10.3.2 Microcontroller mcu 3 · part
10.3.3 SMD Passive (R/C/L) smd-passives 90× 270 · part
10.3.4 Connector connector 18 · part
10.4 Slip Ring Assembly derrick-crane-slip-ring 1 · part
10.5 Wire Bundle wire-bundle 2 · part
10.6 Connector connector 30× 30 · part

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $15k–$2M. How estimates work
VendorHQSpecialtyMOQLead time
🇺🇸Caterpillar
caterpillar.com ↗
Irving, US Construction & mining equipment made to order 16–28 wks
🇯🇵Komatsu
komatsu.com ↗
Tokyo, JP Construction & mining equipment made to order 16–28 wks
🇸🇪Volvo CE
volvoce.com ↗
Gothenburg, SE Construction equipment made to order 16–28 wks
🇨🇭Liebherr
liebherr.com ↗
Bulle, CH Cranes & heavy equipment made to order 16–28 wks
🇨🇳XCMG
xcmg.com ↗
Xuzhou, CN Construction machinery made to order 16–28 wks

1,077-word article