Brake & Retarder System
AssemblyOil-immersed wet multi-disc service brakes on all axles plus a driveline retarder for long laden descents. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Brake & Retarder System parts and their functions
5 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Wet Multi-Disc Brake | 6× | Oil-immersed multi-disc service brakes at each wheel |
| 2 | Driveline Retarder | 1× | Hydraulic driveline retarder for descent control |
| 3 | Brake Treadle Valve | 1× | Treadle and modulating valve metering brake pressure |
| 4 | Parking Brake | 1× | Spring-applied driveline parking brake |
| 5 | Brake Accumulator | 2× | Accumulators storing brake-charge pressure |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Brake & Retarder System
5 top-level lines · 5 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Wet Multi-Disc Brake | articulated-haul-truck-wet-brake | 6× | 6 | · | part |
| 2 | Driveline Retarder | articulated-haul-truck-retarder | 1× | 1 | · | part |
| 3 | Brake Treadle Valve | articulated-haul-truck-brake-valve | 1× | 1 | · | part |
| 4 | Parking Brake | articulated-haul-truck-park-brake | 1× | 1 | · | part |
| 5 | Brake Accumulator | articulated-haul-truck-brake-accumulator | 2× | 2 | · | part |
Where the brake & retarder system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |