Mast and Base

Assembly

The vertical column and base that carry the boom and transfer its loads into the structure or a climbing frame. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Mast and Base parts and their functions

6 top-level parts · 17 parts in total · full bill of materials below
Mast and Base parts diagram: 1 mast tube, 2 cross base, 3 climbing frame, 4 tie collar, 5 outrigger, 6 fastener set. 17 parts in 6 top-level items.
Mast and Base parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Mast Tube 1× Mast tube
2 Cross Base 1× Cross base or pedestal
3 Climbing Frame 3 parts 1× Self-climbing frame
4 Tie Collar 2× Floor tie collars
5 Outrigger 4× Stabilizing outriggers
6 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Mast and Base

6 top-level lines · 9 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Mast Tube concrete-placing-boom-mast-tube 1× 1 · part
2 Cross Base concrete-placing-boom-base-cross 1× 1 · part
3 Climbing Frame 3 parts concrete-placing-boom-climbing-frame 1× 1 8 assembly
3.1 Climbing Jack concrete-placing-boom-climb-jack 2× 2 · part
3.2 Climbing Shoe concrete-placing-boom-climb-shoe 4× 4 · part
3.3 Climbing Rail concrete-placing-boom-climb-rail 2× 2 · part
4 Tie Collar concrete-placing-boom-tie-collar 2× 2 · part
5 Outrigger concrete-placing-boom-outrigger 4× 4 · part
6 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the mast and base is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks