Placing Boom
AssemblyMulti-section folding boom on a slewing turret that positions the delivery pipeline; hydraulic cylinders fold each section and the slewing gear rotates the whole boom. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Placing Boom
6 top-level lines as of r35453| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Boom Pedestal | concrete-pump-truck-pedestal | 1× | 1 | · | part |
| 2 | Slewing Gear 4 parts | concrete-pump-truck-slew-drive | 1× | 1 | 0 | assembly |
| 3 | Boom Section 3 parts | concrete-pump-truck-boom-section | 5× | 5 | 0 | assembly |
| 4 | Boom Cylinder | concrete-pump-truck-boom-cylinder | 5× | 5 | · | part |
| 5 | Delivery Pipeline 2 parts | concrete-pump-truck-pipeline | 1× | 1 | 0 | assembly |
| 6 | End Hose | concrete-pump-truck-end-hose | 1× | 1 | · | part |