BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cage

Assembly

Steel mesh-and-panel car, commonly 1.5 × 3.2 m for 2,000 kg or 25 persons, with full-height doors, a roof hatch for mast erection and guide rollers embracing the mast. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cage parts and their functions

5 top-level parts · 24 parts in total · full bill of materials below
Cage parts diagram: 1 cage frame, 2 sheet metal panel, 3 cage door, 4 roof hatch, 5 guide roller. 24 parts in 5 top-level items.
Cage parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cage Frame 1× Welded cage structure
2 Sheet Metal Panel 8× Wall and roof panels
3 Cage Door 2× Entry doors, both ends
4 Roof Hatch 1× Erection access hatch
5 Guide Roller 12× Mast guide rollers

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cage

5 top-level lines · 5 rows shown · 24 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cage Frame construction-hoist-cage-frame 1× 1 · part
2 Sheet Metal Panel sheet-panel 8× 8 · part
3 Cage Door construction-hoist-cage-door 2× 2 · part
4 Roof Hatch construction-hoist-roof-hatch 1× 1 · part
5 Guide Roller construction-hoist-guide-roller 12× 12 · part

Something wrong in this list? Report a problem with this BOM.

Where the cage is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks