BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Operator Cab

Assembly

ROPS/FOPS cab with seat, controls, and HVAC. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Operator Cab parts and their functions

6 top-level parts · 105 parts in total · full bill of materials below
Operator Cab parts diagram: 1 cab frame (ROPS), 2 cab glass, 3 operator seat, 4 control joystick, 5 display panel, 6 cab HVAC unit. 105 parts in 6 assemblies.
Operator Cab parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cab Frame (ROPS) Rollover-protective steel structure
2 Cab Glass Tempered glass panels
3 Operator Seat Suspension operator seat
4 Control Joystick 4 parts Blade and travel joysticks
5 Display Panel 5 parts Monitor and gauges
6 Cab HVAC Unit 4 parts Cab heating and air conditioning

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Operator Cab

6 top-level lines · 19 rows shown · 105 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cab Frame (ROPS) crawler-dozer-cab-frame 1 · part
2 Cab Glass crawler-dozer-cab-glass 4 · part
3 Operator Seat crawler-dozer-seat 1 · part
4 Control Joystick 4 parts crawler-dozer-joystick 2 5 assembly
4.1 Joystick Grip crawler-dozer-joystick-grip 2 · part
4.2 Hall Position Sensor crawler-dozer-hall-sensor 4 · part
4.3 Bare PCB pcb-bare 2 · part
4.4 Connector connector 2 · part
5 Display Panel 5 parts crawler-dozer-display-panel 1 85 assembly
5.1 LCD Panel lcd-panel 1 · part
5.2 Bare PCB pcb-bare 1 · part
5.3 Microcontroller mcu 1 · part
5.4 SMD Passive (R/C/L) smd-passives 80× 80 · part
5.5 Connector connector 2 · part
6 Cab HVAC Unit 4 parts crawler-dozer-hvac 1 4 assembly
6.1 Heating Element heating-element 1 · part
6.2 Cab Blower crawler-dozer-blower 1 · part
6.3 AC Compressor crawler-dozer-ac-compressor 1 · part
6.4 Cabin Air Filter crawler-dozer-cabin-filter 1 · part

Where the operator cab is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks