BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Main Jaw Frame

Assembly

The welded fixed jaw and body that carries the pivot for the moving arm and reacts the crushing load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Main Jaw Frame parts and their functions

6 top-level parts · 10 parts in total · full bill of materials below
Main Jaw Frame parts diagram: 1 weld body, 2 fixed jaw, 3 pivot pin, 4 pivot bushing, 5 reinforcing gusset, 6 fastener set. 10 parts in 6 top-level items.
Main Jaw Frame parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Weld Body 1× Welded frame body
2 Fixed Jaw 1× Fixed jaw plate
3 Pivot Pin 1× Main jaw pivot pin
4 Pivot Bushing 2× Pivot bushings
5 Reinforcing Gusset 4× Reinforcing gussets
6 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Main Jaw Frame

6 top-level lines · 6 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Weld Body demolition-pulverizer-weld-body 1× 1 · part
2 Fixed Jaw demolition-pulverizer-fixed-jaw 1× 1 · part
3 Pivot Pin demolition-pulverizer-pivot-pin 1× 1 · part
4 Pivot Bushing demolition-pulverizer-pivot-bushing 2× 2 · part
5 Reinforcing Gusset demolition-pulverizer-gusset 4× 4 · part
6 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the main jaw frame is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks