BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Operator Station

Assembly

Cab and control system from which the operator runs hoist, luff, and slew. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Operator Station parts and their functions

5 top-level parts · 245 parts in total · full bill of materials below
Operator Station parts diagram: 1 operator cab, 2 control console, 3 crane PLC, 4 load moment indicator, 5 motion limit switch. 245 parts in 5 top-level items.
Operator Station parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Operator Cab 4 parts 1× Enclosed steel cab with seat and glazing at the mast base.
2 Control Console 4 parts 1× Joysticks and switches feeding the PLC.
3 Crane PLC 5 parts 1× Programmable controller sequencing the drives and interlocks.
4 Load Moment Indicator 5 parts 1× Instrument warning the operator when load and radius approach the rated limit.
5 Motion Limit Switch 4× Switch stopping hoist, luff, or slew at the end of travel.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Operator Station

5 top-level lines · 23 rows shown · 245 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Operator Cab 4 parts derrick-crane-cab 1× 1 12 assembly
1.1 Sheet Metal Panel sheet-panel 6× 6 · part
1.2 Cab Glazing derrick-crane-cab-glazing 4× 4 · part
1.3 Operator Seat derrick-crane-operator-seat 1× 1 · part
1.4 Fastener Set fastener-set 1× 1 · part
2 Control Console 4 parts derrick-crane-control-console 1× 1 17 assembly
2.1 Control Joystick derrick-crane-joystick 2× 2 · part
2.2 Foot Pedal derrick-crane-foot-pedal 2× 2 · part
2.3 Connector connector 12× 12 · part
2.4 Wire Bundle wire-bundle 1× 1 · part
3 Crane PLC 5 parts derrick-crane-plc 1× 1 147 assembly
3.1 Bare PCB pcb-bare 1× 1 · part
3.2 Microcontroller mcu 2× 2 · part
3.3 Relay relay 8× 8 · part
3.4 SMD Passive (R/C/L) smd-passives 120× 120 · part
3.5 Connector connector 16× 16 · part
4 Load Moment Indicator 5 parts derrick-crane-load-indicator 1× 1 65 assembly
4.1 Bare PCB pcb-bare 1× 1 · part
4.2 Microcontroller mcu 1× 1 · part
4.3 LCD Panel lcd-panel 1× 1 · part
4.4 Pressure Sensor pressure-sensor 2× 2 · part
4.5 SMD Passive (R/C/L) smd-passives 60× 60 · part
5 Motion Limit Switch derrick-crane-limit-switch 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the operator station is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks