Outrigger Leveling Jacks
AssemblyFour hydraulic stabilizer jacks that lift and level the rig off its suspension during drilling. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Outrigger Leveling Jacks
3 top-level lines as of r50165| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Jack Cylinder 4 parts | drilling-rig-truck-jack-cylinder | 4× | 4 | 0 | assembly |
| 2 | Jack Ground Pad 1 parts | drilling-rig-truck-jack-pad | 4× | 4 | · | part |
| 3 | Inclination Sensor 2 parts | drilling-rig-truck-level-sensor | 2× | 2 | · | part |