BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Work Platform

Assembly

Steel-framed deck with a slip-resistant floor, folding guardrails, an entry gate, and a manual sliding extension. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Work Platform parts and their functions

7 top-level parts · 13 parts in total · full bill of materials below
Work Platform parts diagram: 1 deck frame, 2 deck floor plate, 3 folding guardrail, 4 toe board, 5 entry gate, 6 roll-out extension deck, 7 upper scissor pin. 13 parts in 7 top-level items.
Work Platform parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Deck Frame 1× Steel deck structure pinned to the top scissor arms
2 Deck Floor Plate 1× Slip-resistant plate floor of the work platform
3 Folding Guardrail 1× Folding guardrail surrounding the deck
4 Toe Board 4× Edge boards stopping tools from sliding off the deck
5 Entry Gate 1× Self-closing gate at the platform entrance
6 Roll-Out Extension Deck 1× Manual roll-out section extending the platform
7 Upper Scissor Pin 4× Pins joining the deck to the top scissor arms

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Work Platform

7 top-level lines · 7 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Deck Frame electric-scissor-lift-deck-frame 1× 1 · part
2 Deck Floor Plate electric-scissor-lift-deck-floor 1× 1 · part
3 Folding Guardrail electric-scissor-lift-guardrail 1× 1 · part
4 Toe Board electric-scissor-lift-toe-board 4× 4 · part
5 Entry Gate electric-scissor-lift-entry-gate 1× 1 · part
6 Roll-Out Extension Deck electric-scissor-lift-extension-deck 1× 1 · part
7 Upper Scissor Pin electric-scissor-lift-upper-pin 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the work platform is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks