BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Operator Cab

Assembly

Enclosed cab mounted near the slew with controls, display and climate unit for the crane driver. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Operator Cab parts and their functions

5 top-level parts · 13 parts in total · full bill of materials below
Operator Cab parts diagram: 1 cab shell, 2 operator seat, 3 control joystick, 4 LCD panel, 5 cab HVAC unit. 13 parts in 5 top-level items.
Operator Cab parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cab Shell 3 parts 1× Cab structure and glazing
2 Operator Seat 1× Console seat
3 Control Joystick 2× Hoist and slew joystick
4 LCD Panel 1× Operator display
5 Cab HVAC Unit 3 parts 1× Cab climate unit

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Operator Cab

5 top-level lines · 11 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cab Shell 3 parts flat-top-tower-crane-cab-shell 1× 1 6 assembly
1.1 Sheet Metal Panel sheet-panel 4× 4 · part
1.2 Cab Glazing Set flat-top-tower-crane-cab-glazing 1× 1 · part
1.3 Fastener Set fastener-set 1× 1 · part
2 Operator Seat flat-top-tower-crane-operator-seat 1× 1 · part
3 Control Joystick flat-top-tower-crane-control-joystick 2× 2 · part
4 LCD Panel lcd-panel 1× 1 · part
5 Cab HVAC Unit 3 parts flat-top-tower-crane-cab-hvac 1× 1 3 assembly
5.1 Heating Element heating-element 1× 1 · part
5.2 HVAC Blower flat-top-tower-crane-hvac-blower 1× 1 · part
5.3 Power Supply power-supply 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the operator cab is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks