Suspension and Access
AssemblyHanger bars, suspension beams and walkways carrying the formwork below the truss and giving access for crews. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Suspension and Access parts and their functions
4 top-level parts · 66 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Suspension Hanger Bar | 12× | Vertical hanger bars |
| 2 | Lower Suspension Beam | 2× | Lower suspension beams |
| 3 | Access Walkway 2 parts | 4× | Access walkway sections |
| 4 | Hanger Levelling Jack | 4× | Hanger levelling jacks |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Suspension and Access
4 top-level lines · 6 rows shown · 66 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Suspension Hanger Bar | form-traveler-hanger-bar | 12× | 12 | · | part |
| 2 | Lower Suspension Beam | form-traveler-suspension-beam | 2× | 2 | · | part |
| 3 | Access Walkway 2 parts | form-traveler-walkway | 4× | 4 | 12 | assembly |
| 3.1 | Walkway Grating | form-traveler-grating | 4× | 16 | · | part |
| 3.2 | Handrail Section | form-traveler-handrail | 8× | 32 | · | part |
| 4 | Hanger Levelling Jack | form-traveler-hanger-jack | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the suspension and access is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$20. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| gabrielindia.com ↗ | Pune, IN | Shock absorbers & dampers | 2,000 pcs | 5–8 wks |
| jaiparabolic.com ↗ | Yamunanagar, IN | Leaf & parabolic springs | 2,000 pcs | 5–8 wks |
| munjalshowa.net ↗ | Gurugram, IN | Shock absorbers & struts | 2,000 pcs | 5–8 wks |
| sokonindustry.com ↗ | Chongqing, CN | Springs & auto parts | 2,000 pcs | 5–8 wks |
| nrbbearings.com ↗ | Mumbai, IN | Needle & auto bearings | 2,000 pcs | 5–8 wks |