BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cable & Hose Management

Assembly

Routing clips, protective sleeves, and strain relief managing hydraulic lines and electrical cables along boom and stick. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cable & Hose Management parts and their functions

4 top-level parts · 17 parts in total · full bill of materials below
Cable & Hose Management parts diagram: 1 cable clip, 2 protective sleeve, 3 spiral wrap, 4 fastener set. 17 parts in 4 top-level items.
Cable & Hose Management parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cable Clip 12× Nylon or rubber-lined clamp securing hose bundles to boom sections.
2 Protective Sleeve 1× Braided nylon or polyurethane tube guarding hoses from abrasion at articulation points.
3 Spiral Wrap 1× Self-closing plastic spiral bundling and protecting multiple hose lines.
4 Fastener Set 3× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cable & Hose Management

4 top-level lines · 4 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cable Clip high-reach-demolition-excavator-cable-clip 12× 12 · part
2 Protective Sleeve high-reach-demolition-excavator-protective-sleeve 1× 1 · part
3 Spiral Wrap high-reach-demolition-excavator-spiral-wrap 1× 1 · part
4 Fastener Set fastener-set 3× 3 · part

Something wrong in this list? Report a problem with this BOM.

Where the cable & hose management is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Motherson
motherson.com ↗
Noida, IN Wiring harness & modules 1,000 sets 4–6 wks
🇮🇳Polycab
polycab.com ↗
Mumbai, IN Wires & cables 1,000 sets 4–6 wks
🇨🇳Luxshare
luxshare-ict.com ↗
Dongguan, CN Connectors & cables 1,000 sets 4–6 wks
🇨🇳Hengtong
hengtonggroup.com ↗
Suzhou, CN Cables 1,000 sets 4–6 wks
🇮🇳Finolex
finolex.com ↗
Pune, IN Wires & cables 1,000 sets 4–6 wks