Operator Cab
AssemblyROPS/FOPS cab with seat, controls, HVAC, and load moment display. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Operator Cab parts and their functions
7 top-level parts · 108 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cab Frame (ROPS/FOPS) | 1× | Rollover-protective steel structure |
| 2 | Cab Glass | 5× | Tempered glass panels with front guard |
| 3 | Operator Seat | 1× | Suspension operator seat |
| 4 | Control Joystick 4 parts | 2× | Front-end and swing joysticks |
| 5 | Travel Pedal | 2× | Track travel pedals and levers |
| 6 | Display Panel 5 parts | 1× | Monitor with load moment readout |
| 7 | Cab HVAC Unit 4 parts | 1× | Cab heating and air conditioning |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Operator Cab
7 top-level lines · 20 rows shown · 108 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cab Frame (ROPS/FOPS) | long-reach-excavator-cab-frame | 1× | 1 | · | part |
| 2 | Cab Glass | long-reach-excavator-cab-glass | 5× | 5 | · | part |
| 3 | Operator Seat | long-reach-excavator-seat | 1× | 1 | · | part |
| 4 | Control Joystick 4 parts | long-reach-excavator-joystick | 2× | 2 | 5 | assembly |
| 4.1 | Joystick Grip | long-reach-excavator-joystick-grip | 1× | 2 | · | part |
| 4.2 | Hall Position Sensor | long-reach-excavator-hall-sensor | 2× | 4 | · | part |
| 4.3 | Bare PCB | pcb-bare | 1× | 2 | · | part |
| 4.4 | Connector | connector | 1× | 2 | · | part |
| 5 | Travel Pedal | long-reach-excavator-travel-pedal | 2× | 2 | · | part |
| 6 | Display Panel 5 parts | long-reach-excavator-display-panel | 1× | 1 | 85 | assembly |
| 6.1 | LCD Panel | lcd-panel | 1× | 1 | · | part |
| 6.2 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 6.3 | Microcontroller | mcu | 1× | 1 | · | part |
| 6.4 | SMD Passive (R/C/L) | smd-passives | 80× | 80 | · | part |
| 6.5 | Connector | connector | 2× | 2 | · | part |
| 7 | Cab HVAC Unit 4 parts | long-reach-excavator-hvac | 1× | 1 | 4 | assembly |
| 7.1 | Heating Element | heating-element | 1× | 1 | · | part |
| 7.2 | Cab Blower | long-reach-excavator-blower | 1× | 1 | · | part |
| 7.3 | AC Compressor | long-reach-excavator-ac-compressor | 1× | 1 | · | part |
| 7.4 | Cabin Air Filter | long-reach-excavator-cabin-filter | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the operator cab is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |