Tower Mast
AssemblyBolted lattice mast built from stacked sections to free-standing height. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Tower Mast parts and their functions
4 top-level parts · 258 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Mast Section 4 parts | 14× | Stacked lattice sections |
| 2 | Mast Foot Section | 1× | Bottom transition section |
| 3 | Mast Connecting Pin Set | 13× | Section connecting pins |
| 4 | Building Tie Frame 3 parts | 1× | Building tie collar |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Tower Mast
4 top-level lines · 11 rows shown · 258 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Mast Section 4 parts | luffing-jib-crane-mast-section | 14× | 14 | 17 | assembly |
| 1.1 | Mast Corner Chord | luffing-jib-crane-mast-chord | 4× | 56 | · | part |
| 1.2 | Mast Diagonal Brace | luffing-jib-crane-mast-diagonal | 8× | 112 | · | part |
| 1.3 | Mast Horizontal Brace | luffing-jib-crane-mast-horizontal | 4× | 56 | · | part |
| 1.4 | Access Ladder Segment | luffing-jib-crane-ladder-segment | 1× | 14 | · | part |
| 2 | Mast Foot Section | luffing-jib-crane-mast-foot-section | 1× | 1 | · | part |
| 3 | Mast Connecting Pin Set | luffing-jib-crane-mast-pin-set | 13× | 13 | · | part |
| 4 | Building Tie Frame 3 parts | luffing-jib-crane-tie-frame | 1× | 1 | 6 | assembly |
| 4.1 | Tie Collar | luffing-jib-crane-tie-collar | 1× | 1 | · | part |
| 4.2 | Tie Strut | luffing-jib-crane-tie-strut | 4× | 4 | · | part |
| 4.3 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the tower mast is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |