Backup Conveyor
AssemblyA longer belt conveyor carried on the backup decks. It takes the rock from the machine conveyor and lifts it over the decks to the transfer point at the rear of the backup. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Backup Conveyor parts and their functions
7 top-level parts · 149 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | TBM Conveyor Belt | 1× | Carries the rock along the backup |
| 2 | Conveyor Drive Unit | 1× | Drives the belt at the discharge end |
| 3 | Tail Pulley and Take-Up | 1× | Turns the belt under the machine conveyor and keeps it tensioned |
| 4 | Impact Idler Set | 4× | Absorb the impact at the transfer from the machine conveyor |
| 5 | Troughing Idler Set | 100× | Support the loaded belt |
| 6 | Return Idler | 40× | Support the empty return belt |
| 7 | Belt Scraper | 2× | Clean the belt at the drive pulley. Primary and secondary |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Backup Conveyor
7 top-level lines · 7 rows shown · 149 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | TBM Conveyor Belt | main-beam-tbm-conveyor-belt | 1× | 1 | · | part |
| 2 | Conveyor Drive Unit | main-beam-tbm-conveyor-drive | 1× | 1 | · | part |
| 3 | Tail Pulley and Take-Up | main-beam-tbm-tail-pulley | 1× | 1 | · | part |
| 4 | Impact Idler Set | main-beam-tbm-impact-idler | 4× | 4 | · | part |
| 5 | Troughing Idler Set | main-beam-tbm-troughing-idler | 100× | 100 | · | part |
| 6 | Return Idler | main-beam-tbm-return-idler | 40× | 40 | · | part |
| 7 | Belt Scraper | main-beam-tbm-belt-scraper | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the backup conveyor is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |