Ground Support Equipment

Assembly

The equipment that installs rock support as the tunnel advances. Roof drills, a ring beam erector, a mesh erector and a probe drill work in the L1 zone directly behind the roof shield, and shotcrete is sprayed from the backup in the L2 zone. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Ground Support Equipment

9 top-level lines as of r193982
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Roof Drill 3 parts main-beam-tbm-roof-drill 2× 2 0 assembly
2 Drill Ring Track main-beam-tbm-drill-ring-track 1× 1 · part
3 Probe Drill main-beam-tbm-probe-drill 1× 1 · part
4 Ring Beam Erector main-beam-tbm-ring-beam-erector 1× 1 · part
5 Wire Mesh Erector main-beam-tbm-mesh-erector 1× 1 · part
6 L1 Work Platform main-beam-tbm-l1-platform 1× 1 · part
7 Shotcrete Manipulator main-beam-tbm-shotcrete-manipulator 2× 2 · part
8 Shotcrete Pump 10 parts shotcrete-pump 1× 1 0 product
9 Grout Mixing and Pumping Plant 8 parts grout-mixing-plant 1× 1 0 product