BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Operator Station

Assembly

The seat, controls, and display from which the operator manages speed, pressure, and the spray system. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Operator Station parts and their functions

5 top-level parts · 11 parts in total · full bill of materials below
Operator Station parts diagram: 1 ROPS canopy, 2 operator seat, 3 control console, 4 LCD panel, 5 wire bundle. 11 parts in 5 top-level items.
Operator Station parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 ROPS Canopy 1× ROPS canopy
2 Operator Seat 1× Operator seat
3 Control Console 4 parts 1× Control console
4 LCD Panel 1× Liquid-crystal display module with backlight and driver electronics that shows the machine's readouts, menus, and status to the operator.
5 Wire Bundle 1× Group of insulated conductors cut to length, terminated, and bound together to carry power and signals between the assemblies of a machine.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Operator Station

5 top-level lines · 9 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 ROPS Canopy pneumatic-tire-roller-canopy 1× 1 · part
2 Operator Seat pneumatic-tire-roller-seat 1× 1 · part
3 Control Console 4 parts pneumatic-tire-roller-console 1× 1 7 assembly
3.1 Drive Lever pneumatic-tire-roller-drive-lever 1× 1 · part
3.2 Bare PCB pcb-bare 1× 1 · part
3.3 Connector connector 4× 4 · part
3.4 Pressure Sensor pressure-sensor 1× 1 · part
4 LCD Panel lcd-panel 1× 1 · part
5 Wire Bundle wire-bundle 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the operator station is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks